Laserfiche WebLink
EARTHWORK ESTIMATING -MOTOR GRADER WORK <br />• TASK DESCRIPTION • -Finish Grade all recontoured surfaces <br />HOURLY EQUIPMENT COST <br />MACHINE MAKE AND MODEL - Cat 14 G <br />Task 10 <br />ATTACHMENTS 3-shank ripper <br />OWNERSHIP COST/hr 38.43 <br />OPERATING COST/hr 35.03 <br />ADJUSTMENTS N/A 0 <br />OPERATOR COST/hr 22.95 <br />MACHINE COST <br />MATERIAL QUANTITIES <br />AREA METHOD (COMPACTED FILLS, PAVEMENT) <br />AREA TO BE GRADED <br />6.09 acres <br />0.833 <br />HOURLY PRODUCTION <br />UNADJUSTED PRODUCTION <br />HOURLY PRODUCTION <br />(@ 50 min / hr) <br />• JOB TIME <br />AREA TO BE GRADED <br />NUMBER OF GRADERS <br />TOTAL JOB TIME _ <br />JOB COST <br />TOTAL JOB TIME <br />TOTAL MACHINE COST <br />COST PER UNIT AREA <br />• <br />1.34 ACRES/HR <br />1.12 ACRES/HR <br />6.09 ACRES <br />1 <br />5.45 HOURS <br />$96.41 $/HR <br />5.45 hours <br />TOTAL JOB COST <br />$78.477 PER ACRE <br />$96.41 <br />5525.79 <br />Mc VOL 1 - Tbl 3.7-1 Task 10 11- 19 - 98 <br />