My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103818
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:15 PM
Creation date
11/24/2007 10:28:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
TABLES 2.1-1 -- 4.1-5
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EARTHWORK ESTIMATING -HYDRAULIC EXCAVATOR (SINGLE SHIFT) <br />Task 2 <br />• TASK DESCRIPTION - Regrade steep slope area South of trailers. <br />HOURLY EQUIPMENT COST <br />MACHINE MAKE AND MODEL - <br />OWNERSHIP <br />OPERATING <br />ADJUSTMENTS <br />OPERATOR <br />MATERIAL QUANTITIES <br />BANK VOLUME <br />4,125 CUBIC YDS x <br />Cat 325 ATTACHMENTS <br />None <br />per hour $30.01 <br />per hour $28.89 <br />per hour none <br />per hour $23.13 <br />MACHINE COST = $82.03 <br />1.27 SWELL = 5,238.8 CUBIC YD5 <br />VERIFICATION OF VOLUME Fig. 3.1-4 Section C-C'; 445.5 sgft X 250 Ift <br />= 4,125 bcy; Swell from CAT handbook tables <br />EXCAVATOR PRODUCTION <br />ALTITUDE 5,600 FEET CORRECTION FACTOR none <br />• CYCLE TIME 0.33 MINUTES for average conditions <br />BUCKET PAYLOAD 1.57 LCY nominal heaped <br />TYPE OF MATERIAL Wet excavated earth <br />BUCKET FILL FACTOR 0.98 <br />ADJUSTED BUCKET PAYLOAD = 1.54 LCY <br />CYCLES PER HOUR = 151.52 (50 minutes per hour) <br />ADJUSTED HOURLY PRODUCTION = 233.12 LCY/HR <br />JOB COST <br />TOTAL MATERIAL VOLUME 5,239 CUBIC YARDS <br />EXCAVATOR PRODUCTIOP 233.12 CUBIC YARDS PER HOUR - <br />NUMBER OF EXCAVATOR; 1 <br />HOURS TO COMPLETE JOB 22.47 HOURS <br />TOTAL MACHINE COST $82.03 <br />TOTAL JOB COST <br />COST PER UNIT VOLUME $0.352 /LCY <br /> <br />$1,843.40 <br />Mc VOL 1 - Tbl 3.7-1 Task 2 11 - 19 - 98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.