Laserfiche WebLink
<br />1 . 6 reef r ~ ow depth <br />ourin~ boo yr storm <br />Rosa <br />36 1 nCh GMP 's <br />• <br />As can be seen from the above sketch, the 188 year - 29 hour <br />storm can be passed by the culverts and the low spot in the road. <br />No damage could result during the flow event other than erosion <br />damage to the road surface at the low point shown. If this <br />occurs, Enron does commit to repair the compacted earth surface <br />of the existing road. The site has been reclaimed for a period of <br />three years and the area Ss revegetating on schedule. It is felt <br />that the alternative described above is better than replacing the <br />• culverts altogether. <br />y/,~si~y <br />