My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103710
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:11 PM
Creation date
11/24/2007 10:21:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
5/23/2005
Doc Name
Amended Application-Gilpin County Response
From
James J. Petrock
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18) Check with the issuing authority to determine which of the following documents are required to complete the review of your application. <br />a) Property map indicating other access, bordering roads and streets. e) Subdivision, zoning, or development plan. <br />b) Highway and driveway plan profile, f) Proposed access design. <br />c) Drainage plan showing impact to the highway right-of-way. g) Parcel and ownership maps including easements. <br />d) Map and letters detailing utility locations before and after h) Traffic studies. _ <br />development in and along the rightof-way. ) Proof of ownership. <br />1- It is the applicant's responsibility to contact appropriate agencies and obtain all environmental clearances that apply <br />to their activities. Such clearances may include Corps of Engineers 404 Permits or Colorado Discharge Permit System <br />permits, or ecological, archeological, historical or cultural resource clearances. The CDOT Environmental Clearances <br />Information Summary presents contact information for agencies administering certain clearances, information about <br />prohibited discharges, and may be obtained from Regional CDOT Utility/Special Use Permit offices or accessed via the <br />CDOT Planning/Construction-Environmental-Guidance webpage htto:llwww.dot.state.co.us/environmental(Forns.asQ. <br />2- All workers within the State Highway right of way shall comply with their employer's safety and health policies) <br />procedures, and all applicable U.S. Occupational Safety and Health Administration (OSHA} regulations -including, but not <br />limited to the applicable sections of 29 CFR Part 1910 -Occupational Safety and Health Standards and 29 CFR Part 1926 <br />- Safety and Health Regulations for Construction. <br />Personal protective equipment (e.g. head protection, footwear, high visibility apparel, safety glasses, hearing protection, <br />respirators, gloves, etc.) shall be worn as appropriate for the work being pertormed, and as specified in regulation. At a <br />minimum, all workers in the State Highway right of way, except when in their vehicles, shall wear the following personal <br />protective equipment: High visibility apparel as specified in the Traffic Control provisions of the documentation <br />accompanying the Notice to Proceed related to this permit (at a minimum, ANSI/ISFJ~ 107-1999, class 2); head <br />protection that complies with the ANSI 289.1-1997 standard; and at all construction sites or whenever there is danger of <br />injury to feet, workers shall comply with OSHA's PPE requirements for foot protection per 29 CFR 1910.136, 1926.95, <br />and 1926.96. If required, such footwear shall meet the requirements of ANSI Z41-1999. <br />Where any of the above-referenced ANSI standards have been revised, the most recent version of the standard shall <br />apply. <br />3- The Permittee is responsible for complying with the Revised Guidelines that have been adopted by the Access Board <br />under the American Disabilities Act (ADA}. These guidelines define traversable slope requirements and prescribe fhe <br />use of a defined pattern of truncated domes as detectable warnings at street crossings. The new Standards Plans and <br />can be found on the Design and Construction Project Support web page at: <br /><http://www.dot.state.co.us/DesianSupportl>, then click on Design Bulletins. <br />If an access permit is issued to you, it will state the terms and conditions for its use. Any changes in the use of the <br />permitted access not consistent with the terms and conditions listed on the permit may be considered a violation of the <br />permit. <br />The applicant declares under penalty of perjury in the second degree, and any other applicable state or federal <br />laws, that all information provided on this form and submitted attachments are to the best of their knowledge. <br />true and complete. <br />1 understand receipt of an access permit does not constitute permission to start access construction work. <br />~Applicanrs signature Print name Date <br />Q ~~ ,~~~ J- Aa.,,~ I ~ r.,ua 3 ~zz to f <br />,lam , <br />If the appli nt is not the owner of ~~~~~~tthe property, we require this application also to be signed by the property owner or <br />their leg thor' representve (or other acceptable written evidence). This signature shall constitute agreement <br />( with thi a i n by II owner -of-interest unless stated in writing. If a permit is issued, the property owner, m most <br />cases ~ be d as t oerml ee. <br />Date <br />J <br />Previous ed'~tions are obsolete and may not 6e used Page 2 of 2 CDOT Form #137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.