Laserfiche WebLink
The revegetated area will be monitored for success of reclamation until accepted by the Division. If <br />revegetation failures occur prior to release, an analysis of the site will be made and the area will be <br />revegetated again as necessary. <br />5. Monitoring Reclamation Success <br />Monitoring the reclamation on an ongoing basis will allow minor revisions to assure successful <br />reclamation. The operator plans to use the local NRCS office in Mesa County to assist in detetntin- <br />ing the ability of the reclaimed land to control erosion. If minor changes or modifications are <br />needed to the seeding and reclamation plan, revision plans will be submitted to the Division as <br />required. It is hoped that the Division will provide assistance in evaluating the success of the ongo- <br />ing reclamation process. All areas disturbed and reclaimed and any other important items regarding <br />the reclamation will be submitted in the annual reports to the Division. <br />19 Road Pit 10102 23 <br />