liability period, TCC will maintain the road for monitoring purposes. After bond release, the land owner will resume <br />responsibility for the road. The northern short section (2,500 feet) of the access road will be reclaimed unless approved <br />• otherwise by CMLRD. <br />Rockdust Tank <br />After removal of the rockdust tank and cement pad, the pit run gravel of the truck access/unloading area will be <br />dispersed across the .5 acres of disturbance. The area will be ripped before the stockpiled topsoil is reapplied. <br />Mine Fan <br />Upon completion of mining, the fan and motor will be removed from the foundation and taken from the site. This will <br />involve unbolting the fan and motor from their respective foundations. The pre-engineered building will be tom down <br />and buried in the pit. The duct work and concrete pad or footers will be left in place and buried during reclamation of <br />the portal azea. <br />In reference to the transformer, it will be removed from its pad and removed from the site. The additional power poles <br />will be knocked down and pushed into the portal excavation azea during reclamation activities. Likewise, the <br />transformer pad will be pushed into portal area during reclamation activities. <br />Coal Handline Svstem <br />The coal-handling system is part of the mine surface facilities and site reclamation (gading, drainage restoration, <br />soil replacement, and revegetation) will be completed in conjunction with overall reclamation of the surface <br />facilities azea. Significant additional rough gading will not be required to address reclamation of the coal handling <br />system. Prior to rough gading the coal handling facilities areas, all usable coal-handling equipment will be <br />removed and salvaged, and the ROM Stacker Tube, Sampling Station, Primary and Secondary Crusher Buildings, <br />• Sample Building, and associated conveyors and related structures will be dismantled and removed from the site or <br />demolished. The top and upper portion of the sides of the ROM Reclaim Tunnel and lateral structures will be <br />broken-up and placed into the tunnels. ARer removal or demolition of the buildings, structwes, and conveyors, the <br />related concrete foundations will be demolished. Any concrete or structural debris resulting from demolition of the <br />coal-handling facilities and related foundations will either be placed in the mine portal area and buried, or disposed <br />of off-site. The associated disturbance areas will then be backfilled and rough-gaded to blend with surrounding <br />terrain. In conjunction with site regading, any surplus fill material not required to establish the design postmining <br />configuration will either be hauled back to one of the original borrow sites, or if suitable material, may be used as <br />cover for the Coa] Refuse Pile. Topsoil will be replaced on the regaded areas from the designated topsoil <br />stockpiles, and the areas will be reseeded with the approved revegetation seed mixture. <br />The Overland Conveyor access corridor will be ripped to a depth of approximately 24 inches and the windrowed <br />topsoil will be redistributed over the corridor. The redistributed topsoil will be seeded with the rangeland seed <br />mixture. The drive building will be dismantled and either removed from the site or hauled to the portal azea for <br />burial. The foundation materials will be handled in the same manner. <br />Washolants I and II <br />The coal-handling system is part of the mine surface facilities and site reclamation (gading, drainage restoration, <br />soil replacement, and revegetation) will be completed in conjunction with overall reclamation of the surface <br />facilities area. When no longer required, all usable coal processing equipment will be removed and salvaged, and <br />the Crushing/Screening and Washplant Buildings and associated conveyors and related structures will be <br />dismantled and removed from the site or demolished. The structures to be removed include the Crushing/Screening <br />Building; Washplant I and the related clean coal, stoker, and refuse conveyors and structures (includes Thickener <br />Tank and Refuse Bin); Washplant II and the related clean coal, stoker, and refuse conveyors and structures <br />.(includes Thickener Tank and Refuse Bin); and the Washplant Sub-Station, and the associated power distribution <br />MR07-216 2.05-102 05/28/07 <br />