Laserfiche WebLink
Reclamation Cost Estimate <br />Per 40-Acre Phase <br />Cost estimates are based on an average affected area in each phase of <br />30 acres. The quote for the seed mix was provided following a season <br />of extreme forest fires that resulted in elevated seed costs. The cost <br />of the seed mix at the time of reclamation is anticipated to be lower <br />than reported. <br />Item Hours Cost/Hour Total Amount <br />Grading and Placement of Growth Medium <br />Re lacin a roximatel 33 000 c er hase <br />4 yd track hoe 132 $200.00 $23,400.00 <br />2 dump trucks 132 $100.00 $13,200.00 <br /> Total for $36,600.00 <br /> Gradin <br />Revegetation <br />Assumin 30 acres <br />Reclamation Sub $400.00/acre $12,000.00 <br />Dozer 10 $75.00 $750.00 <br /> Total for <br />Revegetation <br />$12,750.00 <br />Mob/DeMab 2 hours $500.00 <br />E ui ment <br />Grass seed $200/acre $8,000.00 <br />Mulch -straw $187.50/acre <br />625.00 <br />$5 <br />bales , <br /> Total $63,475.00 <br />