My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103529
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:03 PM
Creation date
11/24/2007 10:10:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005066
IBM Index Class Name
Permit File
Doc Date
10/13/2005
Doc Name
Reclamation Permit Application Form
From
Asphalt Paving Company
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNITED POWER, INC. <br />POLICY <br />MINING ACTIVITIES ADJACENT TO ELECTRIC <br />POWER LINES <br />In order to comply with applicable codes and regulations and United Power safety <br />and operational requirements, mining activities must maintain a minimum of 10' <br />radial clearance from all overhead and underground electric power lines. <br />No mining excavation shall be allowed within a minimum of 10' of any overhead or <br />underground electric power line paralleling a public road or highway or other <br />permanent access. Existing grade must be maintained for a minimum of 10' from <br />the electric power line; from that point; a minimum 3:1 slope shall extend to a <br />distance of at least 35' from the top of the excavation <br />No mining excavation shall be allowed within a minimum of 35' of either side of any <br />overhead or underground electric power line with mining activities on both sides of <br />the line. No excavation shall be allowed within a minimum of 20' of the point that <br />any overhead electric power line guy wire anchor rod enters the ground. <br />Continuous all weather access must be provided to and parallel to all electric power <br />Jines within the area of excavation. A 70' wide corridor, 35' on either side of the <br />electric power line, shall be maintained to allow access by United Power, Inc to <br />overhead electric power poles and -ines and to underground electric system <br />facilities. Please see the attached sketch, Attachment `1A" for typical situation <br />requirements. <br />The intent of this Policy is to ensure the integrity of the electric power line and <br />provide for all weather access to the line for maintenance. <br />All requests for variance to this Policy shall be subject to review and approval of the <br />United Power, Inc. Safety Director. <br />Policy mining adjacent to lines 3/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.