Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 02/11/2005 <br />User: WHE <br />County :La Plata <br />Site :Hockey Gravel Pit <br />Agency or organization name :DMG <br />Permit or otherjob action :112c <br />Task description :Rep <br />HOURLY EQUIPMENT COST <br />ation review <br />OVB 2' deep over 5 acres, first year of <br />Basic machine :Cat D8R Series II - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $42.78 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosUhour : $31.76 NA <br />Total unit cosUhcur : $140.63 Total fleet cost/hour : $140.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 16,133 LCY factor : NA volume: 16,133 LCY <br />Source of estimated volume : (5ac)(43560sf/ac)(2'D)/27 = 16,133.3 cy <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 377.8 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 7.00 <br />Average site altitude : 6,600 fe <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />State :Colorado <br />Permit/job# :M-2004-063 <br />Abbreviation :none <br />Filename : M063-002 <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.10 (Cat HB) <br />Dozing method : f.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshifr/dal <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.16 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.55 <br /> <br />Adjusted unit production : 208.32 LCY/hr <br />Adjusted fleet production : 208.32 LCY/hr <br />Total job time : 77.44 Hours <br />Unit cost : $0.675 /LCY Total job cost : $10,891 <br />