Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br /> <br />1 <br />1 <br />t <br />t <br /> <br /> <br />1 <br />1 <br />IJ <br />1 <br />1 <br />1 <br /> <br />\' <br /> CLIENT BATTLE MOUNTAIN GOLD BOREHOLE No. <br /> PROJECT SAN LUIS 1 <br /> PROJECT No. 14702 SHEET 1 OF 1 ~ <br /> <br />STEFFEN ROBERTSON & HIR5TEN DATE DRILLED 7-8-88 _ INSPECTOR <br />Consulting Engineers DRILLER CUSTOM AUGER DRILLING F. BARBIS <br />LOCATION TOTAL DEPTH 50' <br />COORDINATES N 206210 E 2035330 SURFACE ELEVATION 8495' <br />DEPTH SPT SAMP HYDR USCS DESCRIPTION <br />IFEETI <br /> C <br />5 65/6" SP/ INTERBEDDED SAND 8 GRAVEL LAYERS, <br /> GP FINE TO COARSE GRAINED MA}.. 1" SIZE, <br /> SS LIGHT BROWN, DRY, MODERATELY TO <br />10 70/5` POORLY CONSOLIDATED <br /> SS <br />t5 70/4" <br /> C <br />20 80/3" 22 <br /> SS SC/ SAND, GRAV`cL & CLAY, FINE GRAINED, MAX. <br /> GC 1-3/4", MEDIUM BROWN, DRY, Pc>ORLY <br />25 100/ 26 CONSOLIDATED <br /> 1-1/2" <br /> SS <br />30 100/ INTERBEDDED SANp 8 GRAVEL i-AYERS, FINE <br /> 2_1/2" TO COARSE GRAINED, MAX. 1-1/2" SIZE, <br /> SS LIGHT BROWN, DRY, POORLY CONSOLIDATED <br />35 100/2` <br /> SS SP/ <br /> GP <br />40 10012" <br /> SS <br />45 100/2" <br /> SS <br /> 00/ <br />50 1 DRY <br /> 2-1/2" BOTTOM OF 80RING AT 50' <br />