Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />i <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> CLIENT BATTLE MOUNTAIN GOLD BOREHOLE No. <br /> _ <br />PROJECT SAN LUIS 9 <br /> PROJECT No. 1x702 _ SHEET 2 OF 2 <br /> <br />STEFFEN ROBERTSON & HIRSTEN DATE DRILLED 7/15/88 _ INSPECTOR <br />~ <br />Consulting Engineers DRILLER CUSTOM AUGER DRILLING F.BARBIS <br />.LOCATION TOTAL DEPTH 80' <br />COORDINATES N 212975 E 2038250 SURFACE ELEVATION 8488' <br />DEPTH <br />IFEETI SPT SAMP HYDR USCS DESCRIPTION <br /> <br />S SAND WITH CLAY, VERY FINE GRAINED, LIGHT <br /> SS SC TO MEDIUM BROWN, DRY TO SLIGHTLY MOIST, <br /> POORLY CONSOLIDATED <br />55 60 <br /> <br /> SAND WITH MINOR CLAY, FINE TJ VERY FINE <br /> C <br /> GRAINED, LIGHT BROWN, DRY TC SLIGHTLY MOIST, <br />60 75 POORLY CONSOLIDATED <br /> SS Sp <br />65 75 <br /> C <br />70 100 <br /> SS <br /> SP/ SAND 8 GRAVEL, MEDIUM GRAINEi), LIGH7 <br />75 100/2" 76 SC' BROWN, SLIGHTLY MOIST <br /> SS SAND WITH CLAY, VERY FINE GRAINED, LIGHT TO <br /> SP MEDIUM BROWN, SLIGHTLY MOIST, POORLY <br />80 56 CONSOLIDATED <br />~ DRY <br /> BOTTOM OF BORING AT 80' <br />