My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103443
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103443
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:00 PM
Creation date
11/24/2007 10:04:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984136
IBM Index Class Name
Permit File
Doc Date
8/3/1984
Doc Name
LIMITED IMPACT 110 AND SPECIAL TEN-DAY 111 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' -4- <br />' EXHIBIT F - Proof of Compliance with Local Goverment Zoning <br />In accordance with 34-32-115(4)(e), the Board must make a finding that <br />dill oe in compliance witn local zoning or subdivision reyulations. Yoe <br />t required to submit this information, but a submission would assist the i <br />processing of the application. When the Division notifies the local go <br />existence of this application, it will request information regardiny cor <br />t applicable local law. It is intended that operators nay concurrently a <br />compliance with local requirements at the same time the Division is pror <br />application. Information regarding the status with local goverronent wi <br />' EXHIBIT G - Source of Legal Right-to-enter <br />he operation <br />are not <br />ivision's <br />erninent of the <br />pliance with <br />ne into <br />essing this <br />1 oe Helpful. <br />This could oe a copy of the lease, deed, abstract of title, or current ax receipt. An <br />acceptaole alternative would oe a statement acknarledged by a Notary Pu lic that the <br />operator has the legal right to enter the mine. <br />' EXHIBIT H - Reclamation Costs <br />For a 11U permit, if the operator requests financial warranty to be les than #5,000.00, <br />' the operator must submit facts to support such a request. Otherwise, a financial <br />warranty of ~5,000.uO will automatically oe set, for all 111 permits, he financial <br />warranty shall be $L,500.00 per acre. <br />' EXHIBIT I - Terns of Govern,nental Contracts (111 Applications only] <br />For Special 10-Uay (111) permits, the operator must submit a copy of t <br />' other proof that proves the necessity of a Special 10-day permit. The <br />also suo~nit evidence of the financial warranty provided under the Bove <br />if it was required. <br />1 <br /> <br />NOTICE PROCEDURES <br />' Afcer the application is considered "filed" (pursuant to Rule 1.1(10) w' <br />Land Reclamation Division, notice procedures outlined in rule 3.2 and/or <br />follo~aed. (Format for such notices will de included in the litter you r <br />h1LR staff informing you of the Completeness ("filing") of your applicat' <br /> <br />F INtii~CINL WARRANTY <br />' Prior to pernit issuance, proper perfunnance and financial warranty i <br />accordance witn Rule 7. Please ootain the appropriate form for your <br />financial warranty. <br /> <br />contract or <br />>erator must <br />mental contract, <br />:h the Mined <br />4.2 must be <br />~ceive from the <br />m.) <br />be received in <br />sen method of <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.