Laserfiche WebLink
Rule 2: Permits <br />• The revegetation plan has been designed to meet short- and long-term reclamation goals by: I. <br />controlling erosion and sedimentation; 2. reestablishing vegetative cover which is ecologically <br />comparable to native pre-mine conditions; and 3. restoring livestock grazing wildlife, watershed, <br />and aesthetic values to meet post-operation land use objectives. Revegetation will occur after final <br />grading and redistribution of subsoil and topsoil activities have taken place. <br />Revegetation communities representative of existing native pre-mine plant communities will be <br />established. These communities are presented in Map 2.04.10-I. The surface mine area will be <br />reclaimed to rangeland, with shrub plots, to be established. A sununary of the revegetation <br />sequence. is as follows: <br />• Placement of boulder and brush piles, as appropriate, on surface mine. <br />• Seedbed preparation will be conducted immediately after grading topsoiling and subsoiling. <br />Seeding will be coordinated with other reclamation activities to occur as soon after seedbed <br />preparation as possible and within 90 days of soil replacement Interim revegetation of sites <br />stabilized prior to permanent revegetation such as sediment control or topsoil stockpiles will he <br />conducted as soon after construction as possible. <br />• The site will be seeded using the appropriate revegetation seed mixture. <br />• • Broadcast-seeded areas will be chained, harrowed, dozer-tracked or raked to Finn the seedbed <br />and cover seed. <br />• Certified weed-free hay or straw mulch will be evenly spread over and crimped into seeded <br />area at rates dependent on seeding method and slope. <br />• Annual reports will document species composition and seeding rates. Monitoring will be <br />conducted to identify potential problems with revegetation. <br />•, Revegetated areas will be grazed at an approved level during the last two years of the 10-year <br />reclamation liability period. Vegetation sampling will be conducted on the rcclaimed and <br />extended reference areas prior to grazing each year. <br />• <br />TR-13 2.05-60 Revised 12/8/04) <br />