Laserfiche WebLink
<br />-3- <br />detemrned: <br />b) The Board will errter the lands to perform reclamation Daly if the Board has <br />not beery performed, and <br />i, that reclamation required by law to have bean performed upon such lands has <br />ii. Ural financial warranty forfeiture proceedings described m the Act or similar <br />provisions of subsequ~rt laws, if any, have been urinated. <br />c) The Division, acting for the Board, will enter lands to respond to an emergency ply <br />where the Division determines drat any of the cortdinons of Construction Material Rule 8.4.2. exist. <br />'n The additional conditions set fnrUr in the attached rider, if any, are incorporated herein by <br />referarce. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LO <br />Divisi®r Director <br />