Laserfiche WebLink
<br />Jun 12 07 11:52a Hurgmaiers <br />PROJECT IDENTIFICATION <br />Date : 12-Jun-2007 <br />User: SLB <br />Site :New Honzan Mine <br />State :Colorado _ _ <br />County :Montrose <br />(7207898-9915 <br />p.2 <br />CIRCES Cost Estimatlna Software <br />COST SUMMARY FORM <br />Permit orjob no.: C-1981-008 <br />Abbreviation : none <br />Filename : 0008-000 <br />Agency or organization name :CDRMS <br />Permit orjob action :Technical Revision No. 54 <br />u <br />TASK LIST (DIRECT COSTS) ~ FORM :FLEET TASK DIRECT <br />NO. ~ TASK DESCRIPTION USED I SIZE HOURS COST <br />OOa -Pd area bfasfing/grading __ mary2 <br />sum 1 2,3]4.4 $593,469 <br />OOD -Fine/ gradinghipping <br />_ _ <br />summar72 ] 237.9 $24,692 <br />OOc _ <br />-Seal wells and ddllholes summary 1 54.0 $13,011 <br />OOd -Structural Demolition summary2 i 340.0 5353,881 <br />OOe Topsoil replacement _ summary2 f 863.89 _ _ 3520,116 <br />00I -Hydrologic Structures/Drainage Reestablishment__ summary2 1 473.7 560.593 <br />_ <br />OOg _ <br />RevegetaGOn _ <br />_ <br />Summary_2 <br />__ 1 <br />692.82 _ <br />$]66,523 <br />OOh _ <br />Road reGemation and reestablishment _ summary2' 1 428.0 5696,30 <br />9 <br />OOi Miscellaneous ReGamation Tasks summary2 ] 248.0 _ <br />$44.649 <br />075 -Mobilize equipment for inffial reGamation <br />1 mobilize 1 25.7 551,382 <br />078 _ <br />-Mobilize equipment for pond and ditch reclamation _ <br />mobilize 1 i 25.7 59,300 <br />75b -Mobilize equipment mobilize _ 1 11.7 513,157 <br />766 __ _ <br />Mobilize equipment mobilize ] 11.7 $2,578 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> ._ <br /> ._ .. <br />.. _ I _._ <br /> <br /> <br />sUBTOrAts: 5,728.1 52,549,640 <br />intlWee 7Mlatlun factor adluslnrM of: <br />aa.:. <br />NA % <br />TOTAL DIRECT COST• $2,548,640 <br />OVERHEAD AND PROFlT- Liability inauranCe: 2.02 %Of direcl total= $51,503 <br />Performance bond : 1.05_ %o/dimct tore/ = 526,771 <br />Job superintendent :_ NA NA <br />~ <br />- NA total = 545,957 <br />Profit: 10.00 ~~-%o/direct <br />~ total= $254,969 <br /> rorALOSP= 5379,195 <br />LEGAL-ENGINEERING-PROJ ECT NANAOEMENT- CONTRACT AMOUNT (Nlect~06P)= $2,92$,835 <br />Finandal warranty processing (IegaVrelated costa) : NA NA _NA total = 50 <br />Engineering work and/or contrect/bid preparation : _ 4.25 % of cntr. NA total = $124,475 <br />Redamation management and/or edministreti_on : 3.25 % of Intr. NA <br />total = 595.187 <br />coNnncENCV- <br />~ NA' NA _ <br />total= NA <br />_ <br />•coMinOenciea acrnunfetl /Drat teak /eve/ _ <br />TOTAL INDIRECT COSTS 5598,858 <br />u <br />TOTAL BOND AMOUNT (direct t imdlrect) = 53,148,498 <br />Attachment 3.02.2-2-2 <br />