My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103222
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:50 PM
Creation date
11/24/2007 9:45:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977559
IBM Index Class Name
Permit File
Doc Date
12/13/1977
Doc Name
APPLICATION FOR MLR PERMIT VALCO INC CANON CITY EAST PIT
From
ENVIRONMENT INC
To
DMLR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br />' RECLAMATION COSTS <br />' The two consecutive phases requiring the greatest amount of <br />reclamation work are Phases II and III (4.14 acres + of bank slope <br />' grading, and 4.80 acres + of revegetation). Costs of reclaiming <br />the area disturbed in Phases II and III have been estimated based <br />on the following data: <br /> 1. Grass seed mixture, 15.5 lbs./ac. @ $1.60/lb. $ 24.80 <br /> Fertilizer mixture, 100 lbs. AgriChem (N ) <br />2 <br /> (18-46-0) @ $9.60 per 100 lbs., and 80 <br />1bs. <br /> AgriChem (P205) (34-0-0) @ $5.80 15.70 <br />' ;Mulch (straw), 35 bales/ac. @ $0.70/bale 24.50 <br /> Labor*, 16 man hrs./ac. @ $6.00/hr. 96.00 <br />' Per acre total 161.00 <br /> 2. Seed mixture drilling and mulch crimping, <br />' labor, 1.00 hrs./ac. @ $40.00/hr. 40.00 <br /> 3. Slope grading and reshaping, 2 hrs./ac. @ $40.00/hr. 80.00 <br />' 4. Trees** - 26 Cottonwood, 33 Sumac and 41 Plum, <br /> 100 trees total @ $0.85 ea. 85.00 <br />' Thus, reclamation costs for the combined acreage in Phases II and <br /> III are as follows: <br />' Revegetation, 4.80 ac. @ $161.00 $ 772.80 <br />' Seed mixture drilling and mulch crimping, 4.80 <br />ac. @ $40/ac. 384.00 <br />Slope grading and reshaping, 4.14 ac. @ $80/ac. 331.20 <br />t Trees Total Cost 85.00 <br /> TOTAL RECLAMATION COSTS, PHASES II AND III 1,734.00 <br />' Plus l0yo for state overhead 173.40 <br /> TOTAL $1,907.40 <br />' * Labor includes tree <br />lanti <br /> p <br />ng. <br />' ** Phases <br />Cotton BL thru <br />wood, 70 Y will include the planting of <br />Sumac, 107 Plum and 212 Russion approximately 45 <br />Olive. <br />' 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.