My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103162
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:48 PM
Creation date
11/24/2007 9:40:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Permit File
Doc Date
3/7/2003
Section_Exhibit Name
Addendum D Drainage and Sediment Control Information
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POST REGRADING POND DEMONSTRATION <br />In response to the Division additional issues regarding the Raton Creek pond, MWH has completed <br />the following pond calculations to demonstrate that the pond under existing conditions will meet <br />effluent standards fora 10-year, 24-hour event. The mine site was regraded and seeded in 1998 and <br />moderate vegetation has been reestablished. The clean water diversions are still in place and all runoff <br />from the reclaimed azeas are still diverted to the pond. To demonstrate that the pond discharge <br />during a 10-year, 24-hour event will meet effluent levels, MWH utilized the SEDCAD 4 computed <br />model developed by Civ$ Software Design. MWI-I used the same hydrology inputs outlined in the <br />existing permit with the following exceptions: <br />CN Reclaimed <br />Soil Type: B <br />Ground Covu: Poor <br />Cover Type: Herbaceous <br />CN: 80 <br />C Reclaimed <br />Type and Height of Canopy: <br />Percent Cover: <br />C Factor: <br />P Reclaimed <br />Moderately Rough: <br />No Appreciable Canopy <br />20% <br />0.20 <br />0.9 <br />The following is a summary of the pond information taken from the As-built Survey drawing: <br />Total Pond Volume: 4.91 ac-ft <br />Principal Spillway <br />Type: <br />Invert Elevation: <br />Emergency Spillway <br />Type: <br />Invert Spillway: <br />4" riser with a 4" barrel <br />6342.1 ft <br />Trapezoidal Channel <br />6350.5 ft <br />All input infotmation and results can be found on the SEDCAD 4 computer printout sheets. The <br />following is a summary of the results: <br />Peak Discharge <br />In: 43.2 cfs <br />Out: 0.5 cfs <br />Peak Stage: 6349.7 <br />Total Runoff: 3.80 ac-ft <br />Peak Settleable Concentration <br />In: 106.6 ml/1 <br />Out: 0.0 ml/I <br />Sediment Storage Level: 6341.8 ft <br />~,~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.