Laserfiche WebLink
,, <br />• ~~ <br />i <br />e <br />~y ~ `~~ <br />*.~, ~ . <br />x,876• MINt~,. _ <br />DAVID C. SHELTO N, Ur,~ 1 <br />Richard D. Lamm ~ <br />Governor <br />September 9, 1986 <br />Mr. John H Fergusun <br />Great Guennol Mining <br />1911 Main Ave No 223 <br />Durango, CO 81301 <br />Re: t4-81-185, May Day Mine, Permit Issuance <br />Dear Mr. Fergusun: <br />~ III IIIIIIIIIIIIIIII <br />On September 05, 1986, the Mined Land Reclamation Division found Great Guennol <br />Mining to have satisfied the applicable requirements of C.R.S., 34-32-101 <br />et seq, for obtaining a mining and reclamation permit. Therefore, a permit is <br />being issued. Two signed originals of the permit have been executed. We have <br />kept one copy for our files and are enclosing one copy for your use. Please <br />read the terms of the permit. It is your responsibility to comply with all of <br />the terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3, On your permit anniversary date each year, September 05, you must submit <br />an annual report to us. Please consult Rule 3.4 for 110 Permits, Rule 2.4 for <br />112 Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the <br />specific annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely, j <br />-, ~ . <br />DAVID C. SHELTON <br />Director <br />DCS/tmb <br />Enclosure <br />0819G <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />