Laserfiche WebLink
PART I <br />• Page 7 of 19 <br />E. SPECIAL REQUIREMENTS (CONTINUED) -~ <br />1. Materials Containment Plan (Continued) <br />e. An implementation schedule for additional facilities which might be <br />required in (c) above, but which are not yet operational; <br />f. A list of available outside contractors, agencies, or other bodies <br />which could be utilized in the event of a spill in order to clean <br />up ics effects. If the facility is capable of handling spills <br />in-house, this shall be documented in the plan; <br />g. Provision _'or yearly review and updating of the contingency plan, <br />plus resubmission of the plan to the Division if conditions and/or <br />procedures at the facility change the original plan. <br />The foregoing provisions shall is no way render inapplicable those <br />requirements imposed by Section 311 of the Water Pollution Control Act <br />Amendments o° 1972, regulations promulgated thereunder, the Colorado <br />Water Quality Control Act, and regulations promulgated thereunder. <br />This plan should be prepared by a professional engineer registered i- <br />• the State of Colorado. <br />Nothing herein contained shall be construed as alloying any discharge <br />to waters of the State other than through the discharge points <br />specifically authorized in this permit. Nothing herein contained shall <br />be construed as excusing any liability the permittee might have, civil <br />or criminal, for any spill. <br />The submittal of an Spill Prevention Control and Countermeasure Plan <br />(SPCC Plan) as required by 40 CFR Part 112 may satisfy all or part of <br />this requirement. Should additional materials exist on site which are <br />not addressed in the SPCC Plan, addressing those materials as per the <br />above will be required. <br />r1 <br />LJ <br />Code: i - 21 Date: 1 - B4 <br />