Laserfiche WebLink
PART I <br />Page No. 12 <br />Permit No. CO-0036684 <br />•E. GENERAL MOMTORING, SA~~iPLING AND REPORTING REQUIItEl1~NTS <br />5. Flow hteasurine Device <br />if not already a pan of the permitted facility, within nine[y (90) days after the effective date of the permi[, a flow <br />measuring device shall be ins[alled to give representative values of effluent quantities a[ the respective discharge points. <br />Unless specifically exempted, or modified in Pan I.B.S of this permit, a flow measuring device will be applicable a[ all <br />designated discharge points. <br />At the request of the Division, the permittee shall show proof of the accuracy of any flow-measuring device used in <br />obtaining data submitted in the monitoring report. The flow-measuring device mus[ indicate values within ten (10) <br />percent of the actual flow being discharged from the facility. <br />6. Sienatorv and Certification Requirements <br />(a) All reports and other information required by the Division, shall be signed and certified for accuracy by the <br />permittee in accord with the following criteria: <br />i. In the caze of corpora ions, by a principal executive officer of at least the level of vice-president or his or her <br />duly authorized representative, if such representative is responsible for the overall operation of the facility from <br />which the discharge described in the form originates; <br />ii. In the case of a partnership, by a general partner; <br />iii. [n the case of a sole proprietorship, by the proprietor; <br />• iv. In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking elected <br />official, or other duly authorized employee. <br />(b) All reports required by permits, and ocher information requested by the Division shall be signed by a person az <br />described above or by a duly authorized representative of that person. A person is a duly authorized representative <br />only if: <br />i. The authorization is made in writing by a person described above; <br />ii. The authorization specifies either an individual or a position having responsibility for the overall operation of <br />the regulated facility or activity such az the position of plant manager, operator of a well or a well field, <br />superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for <br />environmental matters for the company. (A duly authorized representative may thus be either a named <br />individual or any individual occupying a named position); and, <br />iii. The written authorization is submitted to the Division. <br />(c) If an authorization az described in this section is no longer accurate because a different individual or position has <br />responsibility for the overall operation of the facility, a new authorization satisfying the requirements of this section <br />must be submitted to the Division prior to or together with any reports, information, or applications [o be signed by <br />an authorized representative. <br />(d) The permittee, or the duly authorized representative shall make and sign the following certification on all such <br />documen[s: <br />"I certify under penalty of law that this document and all attachments were prepared under my direction or <br />• supervision in accordance with a system designed to assure that qualif-ied personnel properly gather and evaluate [he <br />information submitted. Based on my inquiry of the person or persons who manage the system, or those persons <br />directly responsible for gathering the information, the information submitted is to the best of my knowledge and <br />belie(, true, accurate and complete. I am aware that there are significant penalties for subtttitting false information, <br />including the possibili[y of fine and imprisottment for knowing violatiotu.' <br />