Fresh Water Svstem Modification <br />• Ta•entymile Coal Company's fresh water system will be modified to incorporate the million gallon diesel storage <br />tank currenth~ being used by Colorado Yampa Coal Company. A water line will be constructed which will tie in <br />the million ~~allon tank, the existing well and the new fresh water borehole. The location of this system is shown <br />on Map 24, Surface Facilities. <br />Laying of the water line will require excavating a trench approximately 7 [0 15 feet in depth. As shown on Map <br />24, Surface facilities, the majority of the ditch work will occur within previously disturbed areas. For the section <br />of pipe laid in the disturbed area a work corridor, approximately 30 feet wide, will be used. The material <br />excavated from the trench will he placed adjacent to it, and after the pipe is placed the trench will be backfilled. <br />For the undisturbed area the topsoil, approximately 2 fee[ in depth, will be removed from the work area, and <br />temporarih~ srockpiled adjacent to it. Afer the trench is excavated, the water line placed, and the trench backfilled <br />the topsoil will be replaced. <br />A borehole, approximately I50 feet in depth, will be drilled into the mine workings and cased. The borehole will <br />be approximately 12 inches in diameter, and the casing will have a nominal 8" diameter. The annular space will <br />be grouted from the bottom [o the [op. <br />The drill pad required for this project will be constructed on both disturbed and undisturbed land. the part to be <br />constructed on the undisutrbed area will require salvaging approximately 24 inches of topsoil. The topsoil will be <br />temporarily stockpiled adjacent to the pad. Once the system is working the topsoil will he redistributed and seeded <br />with the rangeland seed mixture. <br />• An access road will be constructed into the drill site. The access road will he constructed across an undisturbed <br />area. Approximately 28" of topsoil will be salvaged from [he road corridor and temporarily windrowed to the side. <br />After drilling and setting [he casing the road will be reclaimed by blading the topsail back over the area. The area <br />will he seeded with the rangeland seed mixture. <br />Any future access into the area will be along the existing railroad tracks. Given the limited amount of disturbance <br />and rapid reclamation of the area it is requested that this area be identified as a small area exemption area. <br />Therefore, no sediment control system will be installed. <br />After the system is no longer needed the borehole will be grouted from the bottom to the top. An Octo plug will <br />he placed 10 feet below the surface and the remainder ofthe hole will be backfilled with soil material. <br />The 8 inch fresh water line into [he mine has been damaged and must be repaired immediately. A backhoe will be <br />used to find the leak so that repairs can be undertaken. The pits dug by the backhoe will be backfilled and the <br />site(s) graded smooth and seeded with the approved mixture. Seeding may take place in the spring or fall. <br />A new hole will be drilled approximately 100 fee[ [o dte east of the existing one. This will require preparation of a <br />drill site, which will include stripping topsoil from the drill pad (approximately 100' X 100') and stockpiling it <br />adjacent to the pad. Also, mud pits will be drilled to handle the drilling Fluids that may be required for drilling [he <br />hole. Attempts will be made to drill the hole with air, or air mist, but it may be necessary ro use a drilling mud to <br />complete the hole. Upon completion of this project the site would be reclaimed, and this would include backfilling <br />the mud pit(s), grading the pad, redistributing [he topsoil, and seeding the site. The seeding may take place in <br />• either the spring (this would require reclaiming the site prior to mid-April), or the fall. <br />In order tnget the drill rig to [he site, the bean an the east end of the stoker pad will he temporarily breached and <br />the rig driven over the ~_round to the railroad tracks. This is noted as a ramp on Map 24. The ramp will be back <br />MR 97- I ~4 2.05-~ I Rzvised 9/9/97 <br />