Laserfiche WebLink
~~ <br />1 <br />1 <br />' DISTURPgNCE TIMETgPLE <br />' Mayor Disturbance <br /> Excavated Pit 10 acr^es <br />' Overburden Stockpiles 1 acre <br /> Moderate Disturbance <br />' Pr•oces$ing Plant 3 acres <br /> Haul Road 9 acrsm <br />' Undergoing Backfilling and Or•ading for• Seeding 10 acres <br /> Minor Disturbance <br />' Land Swedwd but not ywt Relwaswd from Warranty 10 acr•ws <br /> Total acres - <br />43 acres <br />t <br /> Thw finished products will be haulwd off the gir•por•t 'u si te On a <br /> haul route proceeding north. This haul route is s hown on the <br />' vicinity map, Exhibit P. The haul road will enter the gir•por•t <br /> PiL 1 site and connect with wxistinp haul roads. The traffic <br /> will thwn cross Eight Milw Cr•wwk on • previously appro ved and <br /> Constructed low watwr crossing. Ths material will thwn procwetl <br /> on wxisting roads up to State Highway 30. 8t ate Hi ghway 30 has <br /> bewn uawd many ywars by Monks Conwtruction as the main accese <br /> point and has adwquatw accwlwration and dwcwlwrat ion l anws to <br /> handle tfie truck traffic. <br /> Thw dwpth of tfiw sand and pravwl rwsourcw iw approxim atwly E'iD to <br />' k'3 feet and it is underlain by soft clay stone. <br />1 <br />1 <br />1 <br />1 <br />1 <br />