Laserfiche WebLink
<br /> <br />• <br /> <br />-3- <br />Ilote: If the application contains proposed (new) acreage, then a permit <br />revision application form must also be completed for those acreages <br />7. Mineral ownership: <br />(indicate currently <br />permitted acre for each) <br />Federal 320 aC., 90 90 90 <br />State ac., <br />Private 80 ac., <br />- 65 65 65 <br />Indian <br />ac. <br />8. Surface ~rship: <br />(indicate currently <br />permitted acreage for <br />each) <br />Federal 320 ac., 90 90 90 <br />State ac., <br />Private ~_ aC., 65 65 65 <br />Indian ac. <br />9. Affected area (in acres) 101.1 101.1 4 <br />10. Disturbed area (in acres) 101.1 101.1 4 <br />11. Acreage of area reclaimed <br />in previous permit term <br />a) backfilled and graded n/a 23,5 n/a <br />b) retopsoiled n/a 23,5 n/a <br />c) reseeded n/a 23.5 n/a <br />12. Acreage for which bond <br />has been released <br />a) 60 percent n/a O n/a <br />b) 85 percent n/a 0 n/a <br />c) 100 percent n/a 0 n/a <br />13. Renewal Term Requested <br />(Years) n/a n/a 5 <br />14. Type of Mine (check one): Underground, x Surface, _ <br />Combined Surface and underground, Load-Out, Other <br />15. Current Permit Status (check one): Active, ~- Temporary Cessation, <br />Permanent Cessation (reclamation only), _ Suspended <br />16. Current Estimated Life of Mine in years: 0 <br />(Revised 04/13/90) <br />