Laserfiche WebLink
1 <br />' 4) Total Depletions During Mining <br />' We will forward complete calculations of depletions during mining upon completion of <br />the Temporary Substitute Supply Plan. <br />' Depletions Ajter Reclamation <br />Total depletions after mining will result from evaporation from the ponds and will be <br />' calculated as part of the Temporary Substitute Supply Plan. We will forward this <br />information to the Division of Minerals and Geology upon completion of the State <br />Engineer's review. <br />' 1. Indicate the projected amount from each of the sources of water to supply the project water <br />requirements for the mining operation and reclamation. <br />It is anticipated that all water for the operation of the site will be provided by water rights <br />associated with the historic agricultural production on this site. The Temporary Substitute <br />' Supply Plan will address the source and amount of water from each water right associated <br />with the property and how each of those water rights will be utilized in the mmmg <br />' operation. <br />1. AtTirm that the Applicant has acquired or applied for a National Pollutant Discharge <br />' Elimination System (NPDES) permit from the Water Quality Control Division at the <br />Colorado Department of Health and Environmental Services. <br />' A permit from the Colorado Health Department to dewater the mine site is currently being <br />applied for and will be forwarded to the Division of Minerals and Geology upon receipt . <br /> <br />1 <br /> <br /> <br /> <br />' NCC/Mining Proposal jor fhe NCC/ Pit # 1- MLRB l l2Permit <br /> <br />2G <br /> <br />