Laserfiche WebLink
• times the drill seeding rate <br />completed as one se <br />arate <br />ass for the permanent seed mix used. Hydroseeding will be <br />f <br />llowed b <br /> p <br />p o <br />y a second pass to app ly mulch and tackifier, <br /> Immediately after completion of hydroseeding, the area will be hydromulched with 2,000 <br /> pounds per acre of virgin wood fibre mulch and 100 pounds per acr e of an organic tacking <br /> agent. The tacking agent should be psyllium based and water insoluble upon drying. <br /> Seedbeds comprised of plant growth medium or parent material may require fertilizer <br /> applications. Any fertilizer applications will be based on fertility analysis as <br /> discussed in Tab 9, Attachment 9-4. Normally, replaced topsoil materials have adequate <br /> fertility and thus fertilization is not practiced. <br />Shrub and tree seedlings will be planted pri marity using hand planting methods. Hand <br />planting improves opportunities for seedlings to be placed in available microsites antl <br />allows planting where site conditions would restrict larger mechanical planting equipment. <br />Hand planting equipment includes planting hoes, spades, and bars, or portable planting <br />augers. Mechanical seedling planting wilt be considered as an optional planting method on <br />sites which are not excessively steep or rocky. Mechanical seedling planting will be <br />conducted on the contour. Planting of shrub and tree seedlings will be Conducted <br />primarily in [he fall as dormant plantings. Spring dormant plantings may be conducted if <br />conditions permit. <br />Mature shrub clump transplant areas will be established using methods similar [a those <br />implemented at the Trapper Mine near Craig, Colorado. Mature shrubs will be salvaged in <br />advance of topsoil stripping operations or from native shrub stands adjacent to the limit <br />of topsoil stripping. The latter may be necessary because life-of-mine topsoil salvage <br />operations are nearly complete at the Seneca Mine. These salvage sites will be close to <br />disturbance areas and will be reclaimed using Seed Mix 1. These small scale disturbance <br />sites are contingent on a need for additional mature shrub clump materials and cannot be <br />identified a[ [his time. <br /> The shrub clump transplant area will be prepared by replacing slightly deeper topsoil in <br /> the transplant area in order for a basin to be constructed that ui ll retain sufficient <br /> topsoil between graded spoil and the transplanted shrub clump. Following the first <br /> killing frost, s hrub clumps will be Salvaged using front-end loaders or similar equipment <br /> and transported to the transplant area. Once the shrub clump is placed in [he basin, <br /> topsoil will be <br />la <br />f <br />h pushed and compacted around each clump. Supplemental watering u itl follow <br /> p <br />cement o <br />t <br />e shrub clump and final topsoil shaping. <br />13-27 Revised 12/01/93 <br />