Laserfiche WebLink
Banks and Gesso. LLC <br />estimated to require up to 15,000 gpm in Phase 1, with more attenuated groundwater <br />effects as the operation becomes more distant from the Colorado River. <br />The applicant/operator commits to following rules and regulations of the Office of the <br />State Engineer regarding wells within 600 feet of the mining operation. Several wells in <br />the vicinity have been identified and included in the engineering evaluation of <br />groundwater effects. No water quality issues at these wells are anticipated to result from <br />the operation. Preliminary analysis shows that the groundwater surface may be <br />depressed at some of the inventoried wells; this effect is in the range of 2 to 15 feet and <br />should not effect the viability of the wells as a water source. The operator continues to <br />study groundwater effects and will pursue appropriate mitigation strategies if significant <br />effects are identified through the course of study. <br />As noted on Exhibit C, groundwater monitoring wells have been installed on the site and <br />data is currently being collected to refine the operator's understanding of groundwater <br />effects. <br />Grand River Park Project 05021 <br />Silt Sand 8 Gravel LLC 19 May 2006 <br />