Laserfiche WebLink
CAMAS Colorado, Inc. • • Page I S <br />Aggregate Production Facility Storrnwater Managemcnt Plan <br />5.0 CONSISTENCY WITH OTHER PLANS <br />The New Thornton facility is currently regulated through the Spill Prevention Control <br />and Countermeasure (SPCC) plans under section 311 of the CWA (as attested to in <br />Section 3f). As such, it reflects the requirements set forth in that Plan, which is <br />incorporated herein by reference. <br />