Laserfiche WebLink
Sheet2 <br />• <br />• <br />• <br />TABLE TR-68-2 <br />RECLAMATION BOND ESTIMATE <br /> <br />ESTIMATE OF D7H HOURS <br /> <br />DRILLSITES SITES LCY/SITE LCY/HOUR HOURS <br /> <br />Redistribute topsoil 5 1,000 349 14.3 <br /> <br />Grading (includes pits) 5 1,167 349 16.7 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />RECLAMATION OF UPGRADED LCY LCY/HOUR HOURS <br />LIGHT USE ROAD <br /> <br />Redistribute topsoil 2,666 349 7.6 <br /> <br />Grading 2,083 349 6.0 <br /> <br /> <br />TOTAL D7H HOURS 44.7 <br /> <br /> <br /> <br /> <br />QUANTITIES AS DETAILED IN NARRATIVE <br /> <br />D7H PRODUCTION CALCULATION <br /> <br />U-Blade with 100 foot average push <br />unadjusted production LCY/HR 700 <br /> <br />ADJUSTMENTS <br />Operator skill 0.75 <br />Job Efficiency 0.83 <br />Grade +10°~ 0.80 <br /> <br />ADJUSTED PRODUCTION -LCY/HOUR 349 <br />Page 1 <br />