My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102839
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102839
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:35 PM
Creation date
11/24/2007 9:19:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 8 NPDES PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 9 <br />Permit No. COG-850000 <br />B. EFFLQENT LIMITATIONS AND MONITORING REQOIREMENTS <br />• b) Facility Inspections <br />qualified personnel identified by the operator shall make a <br />comprehensive inspection of their atormwatar management system, at <br />least twice per year (in the spring and fall), ezcept as provided is <br />paragraphs d and a, below. These comprehensive inspections must be <br />documented and ~•~+'ized in the annual report (sea Part I.C.2 of the <br />permit). <br />1) Material handling areas, disturbed areas, areas used for material <br />storage that are exposed to precipitation, and other potential <br />sources of pollution identified in the SWMP is acrnrdaace with Part <br />Z.8.2.a.2 of this permit shall be inspected for evidence of, or the <br />potential for, pollutant• entering the drainage system. Strnetural <br />atormwater management measures, sediment and control meuuree, and <br />other structural pollution prevention measures identified in the <br />plan ^hall be observed to ensure 'that they are operating correctly. <br />A visual inspection of equipment needed to implement the plan, such <br />as spill response equipment, shall be made. <br />2) Based on the results of the inspection, the description of potential <br />pollutant sources and pollution prevention measures identified is <br />the plan shall be revised as appropriate within two weeks of such <br />inspection. Such revisions shall provide for implementation of any <br />changes to the plan in a timely manner, but in no case more than 60 <br />• days after the inspection. <br />3) A report summarizing the scope of the inspection, personnel making <br />the inspection, the date(s) of the inspection, major observations <br />relating to the implementation of the SWMP, and actions taken in <br />accordance with paragraph (b), above, shall be made and retained as <br />part of the SWMP for at least three years. The report shall ba <br />signed in accordance with Part I.C.7.c of this permit. <br />4) Where semi-annual site inspections are shown in the plan to ba <br />impractical for sites where an employee ie not stationed or dose not <br />routinely visit the site, inspections as required in this part shall <br />be conducted at appropriate intervals specified in the plan, but <br />never leas than once in two years. <br />5) Where semi-annual site inspections are shown in the plan to be <br />impractical for inactive sites (sites where industrial activity is <br />no longer conducted), Bite inspections required by this part shall <br />be conducted at appropriate intervals specified in the plan, but, in <br />no case lees than once in three years. At lease one site inspection <br />required under this part shall be conducted prior to October 1, 1994 <br />or the date two years after such Bite becomes inactive, whichever ie <br />earlier. <br />c) Additional SWMP Reouirements <br />• 1) Signatory Requirements: A copy of the plan shall be signed in <br />accordance with Part I.C.7.c, and retained on site. <br />Amended LO/13/94 Effective ii/iz/o4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.