Laserfiche WebLink
Listed on the following pages are the SEDCAD runs for the l0yr-24hr and 25yr-24hr precipitation events <br />that would influence Pond 012 design. There is also a section near the back of this Attachment that deals <br />with the safety factor the embankment of Pond 012 will have. Attachment 2.05.3(3)12-1, Attachment <br />2.05.3(3)12-2 and Attachment 2.05.3(3)12-3 shows more detailed drawings of Pond 012. <br />Attachment 2.05.3(3)12-1 ~~~~,,,~ 1//$~as <br />TR -sZ <br />