My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102832
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102832
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:34 PM
Creation date
11/24/2007 9:17:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985115
IBM Index Class Name
Permit File
Doc Date
3/10/1999
Doc Name
bond calculation doc
From
DMG
To
Greer
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />D02ER COST 8 PERFORMANCE DATA WORKSHEET <br />Machine Make 8 Model: Cat D8N <br />Dozer Blade: SEMI-UNI VERSAL <br />Attachment #1: ROPS Cab <br />Attachment #2: <br />(1995) <br />Last Cost Revision: April, 1997 <br />BASE EQUIPMENT COSTS (CRG) <br />REFERENCES: 1) <br />2) <br />3) <br />4) <br />Cost Reference Guide (CRG) <br />Contractors Equipment Cost Guide (CECG) <br />Colorado contractors Association <br />Wage Rate Schedule <br />Caterpillar Performance Handbook <br /> ~----------- Base Ownership 8 Overhaul Costs ------------~ --------------- Base Operating Costs ------- -------- <br /> Ownership ~ Over haul ~ field Repair <br /> Depreciation CFC Overhead ~ Labor Pa rtsl Labor Parts I Fuel Lube Tires G.E.C. <br />_______________________ <br />Machine ______________ <br />$16. _____ <br />90 ____________ <br />$6.89 _____________ <br />$6.90 _______ <br />84.63 ________ <br />512.31 ________ <br />$5.14 _______ <br />$9.89 _______________ <br />$11.28 _______ <br />$3.37 _______ <br />$0.00 ________ <br />$1.55 <br />Attachment #1 $0. 00 $0.00 $0.00 80.00 50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />Attachment #2 $0. 00 $0.00 $0.00 $0.00 $0.00 80.00 $0.00 80.00 $0.00 50.00 $0.00 <br />COST ADJUSTMENT FACTORS (CECG) <br />Factor Description Base Value Adj. Value Multiplier <br />Acquisition cost: 8355,510.00 $273,420.25 0.769 <br />Econ. life hrs.-machine: 13,245 10,455 1.267 <br />-attach. #1: 11,000 11,000 1.000 <br />-attach. #2: N/A N/A 1.000 <br />Annual use hours: 2,112 1,525 1.385 <br />Mechanic's labor cost: 527.15 $23.49 0.865 <br />Fuel cost/gal.-gasoline: $1.20 $1.20 1.000 <br />-diesel: $1.07 $1.07 1.000 <br />Cube cost: $3.37 $3.37 1.000 <br />Tire life hours: 0 0 1.000 <br />Tire factor: 0 0 1.000 <br />Tire cost: $0.00 $0.00 1.000 <br />ACOUI SITION COST BREAKDOWN <br />Cost Elements (CECG) Factor Adj. Cost <br />Base purchase price 5355,510.00 <br />Less dealer discount 0.142 $50,482.42 <br />Plus freight 0.020 E7, 110.20 <br />Plus dealer charges* 0.005 E1, 777.55 <br />*CDMG estimate ----------- <br />Adjusted purchase price $313,915.33 <br />Plus taxes: Sales a 3Y $9,417.46 <br /> SMM a2X $6,278.31 <br />Less tire cost $0.00 <br />Less salvage value 0.179 $56,190.84 <br />Net acquisition cost 5273,420.25 <br />ADJUSTED EQUIPMENT COSTS <br /> ---------- Adjusted Ownership 8 Overhaul Costs -- -------~ -------- ----- Ad justed Operating Costs ------ ------- <br />____________________ <br />Acquisition cos[ _____ ____________________ <br />$13.00 ___________ <br />N/A __________ <br />N/A ________ <br />N/A ________ <br />N/A ________ <br />N/A ________ <br />N/A ___________ <br />N/A ___________ <br />N/A _______ <br />N/A _______ <br />N/A <br />Econ.life -Dozer 8 ROPS $16.47 N/A N/A $5.87 515.60 $6.51 512.53 N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A $0.00 $0.00 $0.00 $0.00 N/A N/A N/A N/A <br />Annual usage $18.00 $9.54 $9.56 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts 513.50 $4.77 54.78 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple shifts $12.01 $3.18 53.18 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mech.labor-Dozer 8 ROPS N/A N/A N/A $5.08 N/A $5.63 N/A N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A $0.00 N/A $0.00 N/A N/A N/A N/A N/A <br />Fuel/lube -Dozer 8 ROPS N/A N/A N/A N/A N/A N/A N/A 511.28 $3.37 50.00 $1.55 <br />-Attach. #2 N/A N/A N/A N/A N/A N/A N/A $0.00 $0.00 $0.00 $0.00 <br />sheet 1 of 2 sheets <br />
The URL can be used to link to this page
Your browser does not support the video tag.