Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EOUI PMENT MOBILIZATION / DEMOBILIZATION <br />Task #... 6 Prep. by 555 Filename..M115-b <br />____________ ________ _________ <br />Date..... 02-Mar-99 Permit # M-85-115 Mine......Greernpit <br />____________ ________ _________ <br />Permit Action........ Routine bond recalculation <br />Task Description..... Transport equipment to/from site <br />HOURLY EQUIPMENT COST <br />NOTE - This is a list to select from, not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GVw, 375 HP, diesel powered <br /> -Lt. Trailer 25 [on folding gooseneck, drop deck <br /> -Ned. Trailer 50 [on folding gooseneck, drop deck <br /> -Hvy. Trailer 120 Ton folding gooseneck, drop deck <br />' -Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br /> -Hyd. Crane Grove RT58E rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 ft. boom <br /> -Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 30,000 lb GVw, 210 HP, diesel powered <br />Last Update: ________________________________ __________ _________________ _______________ ___________ <br />August, 1997 (trucks) <br />------------- -------- Lt. Rig Med.Rig Hvy.Ri9 Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />-----------P <br />Ounershi ------------------ <br />Cost/hr - E25.59 ------------------------------- <br />E28.10 E31.38 E1.73 ----------- <br />E24.12 ----------------- <br />E6.88 --------------- <br />E12.66 ----------- <br />E7.88 <br />Operating Cost/hr = E28.38 E30.17 E32.34 E4.82 E31.48 E19.57 E25.56 E11.82 <br />Operator Cost/hr = E22.61 E22.61 E22.61 E21.82 E23.13 E22.35 E21.24 E22.35 <br />Helper Cost/hr = E21.82 E21.82 E21.82 E0.00 E0.00 E0.00 E0.00 E0.00 <br /> Total = 898.40 5102.70 E108. 15 E28.37 <br />__ _______ E78.73 <br />_______ E48.80 <br />_______ E59.46 <br />_______ E42.05 <br />_______ <br />NON-ROADABLE _______ <br />EQUIPMENT: _______ _____ <br />------------- --------- weight Ownership Haul Rig Fleet S ize Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (no. hau led) Cost/hr Cost/hr <br />____________ Cost/ea <br />___________ <br />_____________ <br />CAT DSN _________________ ________________________________ <br />34.60 E37. 10 E102.70 ___________ <br />1 _________________ <br />E139.80 ___ <br />8102.70 E0.00 <br />________________________________________________________________________________________________________________ <br />Subtotals E139.80 E102.70 E0.00 <br />