Laserfiche WebLink
t• _~ <br />~~ <br />EXHIBIT B MINING <br /> <br />CONSTRUCTION MATERIAL WILL BE REMOVED WITH FRONT-END LOADERS AND <br />DOZERS STARTING FROM THE PIT AND WORKING TO THE SOUTHEAST. <br />TRANSPORTATION TO THE PROJECT AREA IS BY TRUCK AND UPON DEMAND. <br />THERE WILL BE NO GROUNDWATER OR SURFACE WATER RIGHTS INVOLVED IN <br />THE OPERATION. NO WATER TABLE IS ANTICIPATED TO BE ENCOUNTERED <br />IN THE EXCAVATION. THERE WILL BE NO WATER REQUIRED FOR ANY ASPECT <br />OF THE OPERATION. <br />THE ACUTAL AREA TO BE MINED WILL COVER 5.0 ACRES, AS SHOWN ON THE <br />MAP. <br />THE TOTAL AFFECTED AREA WILL COVER NO MORE THAN S.0 ACRES AS SHOWN <br />ON MAP. <br />TIMETABLE OF OPERATIONS: THE PROJECT WILL BE IN AN UNKNOWN AMOUNT <br />OF STAGES DEPENDING ON WHEN GROUND IS NEEDED FOR SURFACING ROADS <br />IN THE AREA. <br />THE MATERIAL TO BE MINED WILL BE SAND AND GRAVEL. <br />NO MORE THAN 70,000 TONS OF MATERIAL WILL BE MINED INCLUDING <br />OVERBURDEN. <br />ANTICIPATED DEPTH OF PIT EXCAVATION IS S FEET. <br />NO TOPSOIL WILL BE STRIPPED. TOPSOIL HAS SO MUCH LARGE MATERIAL <br />THAT THE FINIIS CANNOT BE SEPARATED. <br />