My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102767
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102767
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:32 PM
Creation date
11/24/2007 9:13:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 16 ROOF CONTROL INFO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION OF PERMANENT ROOF SUPPORT <br />DOUBLE BOOM BOLTER <br />WITH AUTOMATIC 'TEMPORARY ROOF SUPPORT <br />LEGEND <br />I~~ = 8 <br />~ ROOF DOLT <br />O FUTURE LOCATION OF ROOF BOLT <br />D BOLTING SEQUENCE <br />-~ BOLTER TEMPORARY ROOF <br />~ i SUPPORT ARM AND <br />~ ~ SAFETY CANOPY <br />i <br />~ r~ <br />~ ~ <br />i ~ <br />MIRROR IMAGE APPLIES <br />~A' DENOTES ONE DOOM <br />SIDE OF THE BOLTER <br />~B DENOTES THE OPPOSITE <br />BOOM SIDE OF 'A' <br />:~ SPOT BOLT INSTALLND <br />IF REQUIRED, PRIOR TO <br />INSTALLING Ili <br />zo YAx. <br />S YAx.-+j.-S YA <br />~.1 <br />.•.~ <br /> sn so sA 34 <br /> a ^ ^ ^ T , <br /> s' <br /> ~ w% <br /> ~ <br />~ <br /> eo 7v ~iA . iA <br /> u ^ ~ e ~ o - - <br /> . <br />> <br /> ` ~ <br /> s' <br /> ~ ~ wx <br /> ~ <br /> o <br />~ <br />~ <br /> zo . sn <br />~ <br />i <br />i iA .X <br /> O ( Ci ~~ <br />d IG <br /> ~ ~ <br /> ~ <br /> ` <br />~~ <br />~ <br />s . <br /> ~ <br />~~ YAx <br /> ~ I <br /> <br />rs ® ® ® v ~ a <br />m QG ® 0 >A ^ ^ <br />® ® H ® ® ^ ^ ^ <br /> <br /> <br />Note: <br />Due to variable mining conditions and circumstances, the above pattern <br />is a typical pattern, but may require alteration of which boom installs <br />a particular bolt. I'or an example, "n" boom may be required to install <br />3 "B" bolt <br />BOLTING SEQUENCE <br />IIolter roof support as'ms will be positioned to the roof approximately 5 <br />feet inby the last permanent roof support. bolting will start nearest . <br />the rib and continue toward the center of the entry. <br />
The URL can be used to link to this page
Your browser does not support the video tag.