Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br />Introduction 13-12A-1 <br />Embankment and Excavation 13-12A-1 <br />Design Analysis 13-12A-1 <br />Summary 13-12A-2 <br />Construction Summary 13-12A-2 <br />Conclusion 13-12A-4 <br />Addendum 13-12A-A - 10-Year, 24-Hour SEDCAD Input and Outputl <br />Addendum 13-12A-B - 25-Year, 24-Hour SEDCAD Input and Ou[put~ <br />Addendum 13-12A-C - Outflow Spillway Design <br />Addendum 13-12A-D - Pond 012 Final Geo technical Repo r[ and Summary <br />Addendum 13-12A-E - Pond 012 Compa c[ion Testing Results <br />u <br /> <br />i Revised 03/00 <br />