Laserfiche WebLink
t~ ~_ <br />-1- <br />• Stipulation No. 17: <br />PRIOR TO SECONDARY OR RETREAT MINING UNDER APACHE CANYON, THE PERMITTEE <br />MUST SUBMIT TO THE DIVISION SUFFICIENT EVIDENCE FOR THE DIVISION TO t4RKE <br />FINDINGS THAT THE OPERATION WILL: <br />1) NOT INTERRUPT, DISCONTINUE, OR PRECLUDE FARMING ON THE ALLUVIAL <br />VALLEY FLOORS. <br />~-~-2)-_NOT CAUSE MATERIAL DAMAGE TO THE QUANTITY OF GROUND WATER THAT <br />SUPPLIES THE ALLUVIAL VALLEY FLOORS. <br />3) PRESERVE THE ESSENTIAL HYDROLOGIC FUNCTIONS OF THE ALLUVIAL VALLEY <br />FLOORS. <br />/ Stipulation No. 18: <br />WITHIN 12 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT THE <br />RESULTS OF 7Hf ANALYSIS OF A GRAB SAMPLE FROM THE TOPSOIL STOCKPILE NEAR <br />THE DEVELOPMENT WASTE DISPOSAL PILE. IN ADOITIOIV, THE PERMIT <br />APPLICATION MUST BE UPDATED TO INCLUDE THIS INFORMATION. <br />Stipulation No. 19: <br />WITHIN 12 MONTHS OF PERMIT ISSUANCE THE PERMITTEE MUST PROVIDE A PLAN TO <br />• THE DIVISION FOR THE RECLAMATION OF ALL DISTURBED SURFACE LANDS WHICH <br />WILL NOT BE RETOPSOILED DURING RECLAMATION. THIS PLAN MUST INCLUDE <br />ANALYSES OF AN APPROPRIATE NUMBER OF SAMPLES OF THE DISTURBED MATERIAL . <br />TO DEMONSTRATE SUITABILITY Of THE MATERIAL TO A DEPTH OF 40 INCHES 'ON <br />THE BASIS OF TEXTURE, pH, ELECTRICAL CONDUCTIVITY, SAR, SATURATION <br />PERCENTAGE, PERCENT ORGANIC MATTER, SELENIUM, AND BORON. THE PLAN MUST <br />ALSO INCLUDE APPROPRIATE MEASURES WHICH WILL BE EMPLOYED DURING <br />PREPARATION OF THE DISTURBED SURFACE PRIOR TO SEEDING (i.e., REDUCTION <br />OF COMPACTION). <br />IF THE ANALYSES OF THE IN-PLACE MATERIAL INDICATE THAT SUCCESSFUL <br />REVEGETATION CANN07 BE ATTAINED, THE PERMITTEE MUST EITHER APPLY <br />APPROPRIATE AMENDMENTS TO MAKE IT SUITABLE OR IMPORT SUITABLE MATERIAL. <br />IF AMENDMENTS OTHER THAN NITROGEN, PHOSPHORUS, POTASSIUM, SULFUR, OR <br />IRON ARE REQUIRED, THE PERMITTEE MUST SUBt4IT THE RESULTS OF APPROPRIATE <br />TESTS TO PROVE THE AMENDMENT MATERIAL IS SUITABLE FOR RE VEGETATION. <br />THIS PLAN HILL BE SUBMITTED AS A REVISION TO THE PERMIT. <br />~~ Stipulation No. 20: <br />THE PERMITTEE SHALL SUBMIT TO THE DIVISION A TABLE OF THE ACTUAL ANO <br />PROPOSED ACREAGES OF DISTURBANCE FOR EACH VEGETATION TYPE AT THE ALLEN <br />MINE WITHIN 30 GAYS OF PERMIT ISSUANCE. FOR THOSE VEGETATION <br />COMMUNITIES (PONDEROSA PINE - OAK, PONDEROSA PINE - OAK -DOUGLAS FIR, <br />OR WILLOW CARR, WHICH COMPRISE 5 PERCENT OR LESS OF THE LIFE-OF-MINE <br />• AFFECTED ACREAGE, NO ADDITIONAL BASELINE SAMPLING WILL BE REQUIRED. <br />