Laserfiche WebLink
~ ~ <br />-s- <br />D) QUARTERLY t40NITORING, (FEBRUARY, MAY, AUGUST, AND NOVEMBER) OF <br />ALLEN MINE DISCHARGE. THE PARAMETERS TO BE MONITORED INCLUDE FLOW, <br />,.~ FIELD pH, FIELD ELECTRO-CONDUCTIVITY, FIELD WATER TEMPERATURE, <br />TURBIDITY, TOTAL SUSPENDED SOLIDS, TOTAL DISSOLVED SOLIDS, TOTAL <br />COMBUSTIBLE SOLIDS, TOTAL HARDNESS, TOTAL IRON, TOTAL MANGANESE, <br />AND PARAMETERS REQUIRED UNDER THE PERMITTEE'S NPDES PERMIT. <br />E) ANNUAL MONITORING (NOVEMBER) OF THE MIDDLE FORK OF THE PURGATOIRE <br />RIVER UPSTREAM OF THE ALLEN MINE, BELOW THE COAL REFUSE PILES AND <br />THE ALLEN MINE DISCHARGE. THE PARAMETERS TO BE MONITORED INCLUDE <br />THE FIELD PARAMETERS IDENTIFIED ABOVE IN THIS STIPULATION, PLUS <br />DISSOLVED OXYGEN, TURBIDITY, TOTAL SUSPENDED SOLIDS, TOTAL <br />COMBUSTIBLE SOLIDS, TOTAL DISSOLVED SOLIDS, TOTAL HARDNESS, AND <br />TOTAL RECOVERABLE MEASUREMENTS FOR THE IONS CARBONATE, BICARBONATE, <br />CHLORIDE, SULFATE, AMMONIA, NITRATE/NITRITE, CALCIUM, MAGNESIUM, <br />POTASSIUM, SODIUM, BORON, CADMIUM, COPPER, IRON, LEAD, MANGANESE, <br />MERCURY, NICKEL, SELENIUM, ZINC, SILVER, AND A DETERMINATION OF SAR. <br />F) ANNUAL MONITORING (NOVEMBER) OF THE ALLUVIAL WELLS ALONG THE MIDDLE <br />FORK ABOVE AND BELOW THE ALLEN MINE. THE PARAMETERS TO BE <br />MONITORED INCLUDE GROUND WATER LEVELS, FIELD pH, FIELD <br />ELECTRO-CONDUCTIVITY, FIELD WATER TEMPERATURE, TOTAL DISSOLVED <br />SOLIDS AND DISSOLVED IONS MEASUREMENTS FOR CARBONATE, BICARBONATE, <br />CHLORIDE, SULFATE, SULFIDE, AMMONIA, NITRATE/NITRITE, CALCIUM, <br />MAGNESIUM, POTASSIUM, SODIUM, BORON; CADMIUM, COPPER, IRON, LEAD, <br />MANGANESE, MERCURY, NICKEL, SELENIlS~1, ZINC, SILVER, ANO A <br />• DETERMINATION OF SAR. <br />G) SUBMIT ALL SURFACE ANO GROUND WATER MONITORING DATA QUARTERLY. <br />H) MONITORING REQUIREMENTS MAY BE REDUCED BY THE DIVISION UPON THE <br />SUBMITTAL OF ADDITIONAL DATA AND A FORMAL REDUCTION REQUEST. <br />Stipa]ation No. ]3: <br />THE PERMITTEE SHALL CONDUCT MINE INFLOW STUDIES FOR ALL ACTIVE OR <br />UNSEALED UNDERGROUND COAL MINE WORKINGS. ANNUAL INFLOW STUDIES SHALL BE <br />CONDUCTED FOR EACH ACTIVE OR UNSEALED AREA OF WORKINGS IN 7HE MONTH OF <br />JUNE, AND THE RESULTS OF EACH INFLOW STUDY SHALL BE SUBMITTED TU THE <br />DIVISION BY THE FIRST Of AUGUST OF THE SAME YEAR. THE MINE INFLOW <br />STUDIES SHALL INCLUDE: <br />A) THE MAPPING OF EACH POINT SOURCE INFLOW (I.E. FAULTS, FRACTURED <br />ROOF, FRACTURED FLOOR, EXPLORATION DRILL HOLE, ETC.) AND EACH AREA <br />WIDE INFLOW (I. E., DRAINAGE FROM SEALS TO ABANDONED MINE 'dORKINGS: <br />AREAS OF WEEPING COAL FACES, ROOF, OR FLOOR, ETC.) ON UP-TO-DATE <br />MINE WORKINGS MAPS; <br />B) THE PRODUCTION OF TABLES OF ALL POINT SOURCE INFLOWS MAPPED WITH <br />DATA ON THEIR FLOW RATES. <br /> <br />