Laserfiche WebLink
<br />-lo- <br />• EITHER PLAN WILL BE SUBMITTED AS A REV ISIOIV, SUBJECT TO APPROVAL 8Y THE <br />DIVISION, AND WILL BE IMPLEMENTED BY THE PERMITTEE DURING THE <br />RECLAMATION OF 7HE PILE. <br />•/ Stipulation No. 28: <br />WITHIN 60 GAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT A <br />NARRATIVE, MAPS, PLANS, AND SUPPORTING CALCULATIONS TO PROVE THE ACCESS <br />ROADS AND LIGHT-USE ROADS ARE IN COMPLIANCE WITH THE REQUIREMENTS OF <br />RULE 4.03. THIS PLAN MUST INCLUDE AT A MINIMUM: <br />A. A NARRATIVE, PLANS, AND SUPPORTING CALCULATIONS PROVING THAT ALL <br />ACCESS AND LIGHT USE ROAD DRAINAGE DITCHES AND CULVERTS ARE SIZED <br />TO PASS THE PEAK FLOW FROM A 10 YEAR, 24 HOUR PRECIPITATION EVENT. <br />B. A IMP OR MAPS SHOWING THE LOCATION OF ALL ROAD CULVERTS, STREAM <br />FORDS, AND BRIDGES. <br />C. EITHER A PLAN TO BRING THE APACHE,CANYON STREAM FORDS INTO <br />COMPLIANCE, OR A REQUEST FOR A VARIANCE FROM INSTALLING CULVERTS IN <br />ACCORDANCE WITH RULE 4.03.3(2)(c). <br />D. A NARRATIVE ADDRESSING THE ACCESS ROAD CULVERT SPACING REQUIREMENTS <br />OF RULE 4.03.2(4)(e)(v). IF THE PRESENT CULVERT SPACING IS NOT IN <br />COMPLIANCE WITH RULE 4.03.2)4)(e)(v), THE PERMITTEE MUST EITHER <br />• SUBMIT A PLAN TO BRING THE ROADS INTO COMPLIANCE OR REQUEST A <br />VARIANCE FROM THE CULVERT SPACING REQUIREMENTS IN ACCORDANCE WITH <br />RULE 4.03.2(1){e). <br />THIS INFORMATION WILL BE SUBMITTED AS A REVISION TO THE PERMIT. <br />~ Stipulation No: 29: <br />THE PERMITTEE MUST SUBMIT, AS A REVISION, A RECLAMATION PLAN FOR ROADS <br />AT THE ALLEN MINE THAT MEETS THE REQUIREMENTS OF RULES 4.03.2(7) AND <br />4.03.3(7) WITHIN 12 MONTHS OF PERMIT ISSUANCE. <br />'~~ Stipulation No. 30: <br />7HE PERMITTEE MUST COMPLETE PILLAR STABILITY CALCULATIONS FOR THE 50X <br />PROJECTED EXTRACTION LIMIT CONFIGURATION CONTAINED WITHIN THE <br />APPLICATION. THESE ANALYTICAL CALCULATIONS, PREPARED IN ACCORDANCE WITH <br />AN ANALYTICAL METHOD ACCEPTABLE TO THE DIVISION, SHALL BE SUBMITTED TO <br />THE DIVISION FOR REVIEW WITHIN 60 DAYS FOLLOWING PERMIT ISSUANCE. <br />,~ Stipulation No. 31: <br />THE PERMITTEE SHALL SUBMIT A COMPLETE COPY OF MAPS AND PLANS WHICH <br />EXHIBIT AN APPROPRIATE ORIGINAL SIGNATURE ANO SEAL OR CONDUCT <br />• RECERTIFICATION OF ONE SET OF MAPS CURRENTLY ON FILE AT THE DIVISION <br />. OFFICE WITHIN 30 DAYS OF PERMIT APPROVAL. <br />