My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102636
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:27 PM
Creation date
11/24/2007 9:02:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH1 TAB 13 APPENDIX III SEDCAD AND HYDRAULICS DESIGNS AREA 1 PERMANENT DRAINAGE 100-YR 24-HR EVENT
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• the "Pipe Flow Charts" in HDS-3. If flow in the culvert has a free surface, entrance <br />control exists, and exit velocity can be approximated by using the greater of normal or <br />critical velocity determined by the "Pipe Flow Charts" in HDS-3. <br />Maintenance. Access roads will be inspected on a daily work basis at the Nucla East Mine. <br />If, upon inspection, it is determined that repairs are needed, appropriate repairs such <br />as, but not limited to, bl ading, filling of potholes, replacement of the road surfaces, <br />revegeta tion of side slopes and watering for dust control, will be conducted as necessary. <br />Restoration. Unless Peabody requests retention of access roads for postmining land use <br />and the Division approves such request, immediately after the road is no longer needed for <br />operations, reclamation, or monitoring: <br />a. The road will be closed to vehicular traffic; <br />b. The natural-drainage patterns will be restored; <br />c. All bridges and culverts will be removed; <br />d. Roadbeds will be ripped, plowed and scarified; <br />e. Fill slopes will be rounded or reduced and shaped to conform the site to <br />• adjacent terrain and to meet natural-drainage restoration standards; <br />f. Cut slopes will be shaped to blend with the natural contours; <br />g. Terraces will be constructed as necessary to prevent excessive erosion and to <br />provide long-term stability in cut-and fill slopes; <br />h. The regraded area will be covered with topsoil in accordance rvith the approved <br />reclamation plan; <br />i. Unless otherwise authorized by the Division, all road-surfacing materials will <br />be removed, hauled or conveyed and disposed under 4.11.4. <br />Light-Use Roads <br />At the Nucla Mine, there is approximately 1.44 miles of existing and proposed light-use <br />roads. There is approximately 1.09 miles of existing light-use roads. These roads will <br />only be used on an intermittent basis for purposes other than transportation of coal <br />including, but not limited to, roads used for monitoring and periodic maintenance of <br />monitoring facilities and reclamation areas, intermittent equipment passage from one mine <br />area to another mine area, or other occasional use. At the Nucla East area, there are <br />approximately 0.35 miles of proposed light-use roads. These roads will only be used as <br />described above on an intermittent basis. <br />13-29 Revised 08/19/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.