My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102636
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:27 PM
Creation date
11/24/2007 9:02:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH1 TAB 13 APPENDIX III SEDCAD AND HYDRAULICS DESIGNS AREA 1 PERMANENT DRAINAGE 100-YR 24-HR EVENT
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Each layer of the embankment will be completed, leveled and compacted before the <br />• succeeding layer is placed. Successive layers will be compacted evenly by routing dozers, <br />trucks and scrapers over the entire width of the embankment. This procedure will be <br />continued until no visible horizontal movement of the embankment material is apparent. <br />Embankment layers will be compacted to a minimum of 90 percent of Standard Proctor density <br />or as directed by the engineer to ensure that the embankment is adequate to support the <br />anticipated volume of traffic and weight and speed of vehicles to be used. <br />Material will be placed in an embankment only when its moisture content fs within <br />acceptable levels to achieve design compaction. <br />Temporary erosion control measures (ditches, berms, straw dikes, silt fence) will be <br />utilized during embankment construction to minimize sedimentation and erosion until <br />permanent control measures can be established. Immediately upon completion, measures will <br />be taken to stabilize all embankments with vegetation cover or other means as approved by <br />the regulatory authority to minimize erosion. Where a vegetation cover is used, <br />consideration shall be given to providing an appropriate growth medium. <br />• Drainage. Each access road not within areas disturbed by mining and reclamation <br />activities will be designed, constructed and maintained to have adequate drainage using <br />ditches and culverts to safely convey the peak runoff from a 10-year, 24-hour <br />precipitation event while maintaining a minimun of one foot of freeboard to the top of the <br />road embankment (see Exhibit 13-20 for typical details of drainage structures). <br />Drainage ditches will be placed at the toe of all cut slopes formed by the construction of <br />haul roads. Water will be intercepted before reaching a large fill and drained safely <br />away in accordance with the requirements of 4.03.1. Water from a fill will be released <br />below the fill through conduits or in adequately lined channels and will not be discharged <br />onto the fill. <br />When drainage ditches discharge onto open terrain, a number of measures will be taken to <br />protect the terrain from erosion. When the drainage discharges onto a disturbed area, the <br />area will be revegetated to control runoff. In an area where revegetation would not be <br />sufficient to control erosion, the area will be riprapped. Temporary measures to reduce <br />erosion will be employed while the area is undergoing revegetation such as straw dikes, <br />• containment ditches, etc. <br />13-26 Revised 04/11/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.