My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102635
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:27 PM
Creation date
11/24/2007 9:02:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996076
IBM Index Class Name
Permit File
Doc Date
10/1/1996
Doc Name
WESTERN SLOPE FLAGSTONE QUARRY 2 FN M-96-076 RECEIPT OF 110 CONSTRUCTION MATERIALS RECLAMATION
From
DMG
To
WESTERN SLOPE FLAGSTONE
Section_Exhibit Name
EXHIBIT L PERMANENT MAN MADE STRUCTURES ADDENDUM 1 NOTICE REQUIREMENT AFFIDAVIT OF POSTING NOTICE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-2- <br />feign) at the location of the proposed access to the site. After having <br />posted such notice (sign), failure by an Applicant to maintain such notice <br />shall not constitute just cause to deny approval of the application. At <br />the time the application is filed with the Office, the Applicant shall <br />provide a signed affidavit that such notice (sign) was posted according to <br />the provisions of this Rule. <br />A sample notice is enclosed for your use. <br />Your application will not be considered filed until the information listed above <br />is received and found sufficient to begin our review. A decision date will be <br />established 30 days from the date of receipt of all of the requested information. <br />Additionally, if you have already published notice you will need to republish <br />notice, after the Division considers the application submitted. Republication <br />must occur once within ten (10) days of the submittal date. We will notify you <br />when you should initiate republication of your notice. The final date for <br />receiving comments is ten (10) days after the date of publication or the next <br />regular business day. <br />This letter shall not be construed to mean that there are no other technical <br />deficiencies in your application. The Division will review your application to <br />determine whether it is adequate to meet the requirements of the Act after <br />submittal of all required items. <br />Sincerely, <br />Lave n P. Lemay <br />Prog m Assistan <br />Enclosures <br />M:\OSS\amm\TEMP\AP020076.LPL <br />
The URL can be used to link to this page
Your browser does not support the video tag.