Laserfiche WebLink
<br />Mr. Tom Schreiner <br />Division of Minerals and Geology <br />April 7, 1997 <br />Page 2 <br />(a) With this program in effect, there is no need to contact the State Engineer's Office about <br />mitigating for evaporative loss, since none will be involved. <br />(b) The applicant believes that [he above information constitutes an assessment of possible <br />impacts to surface or groundwater. The determination of [he static water table by a certitied <br />engineer is the primary measure to prevent possible impacts to surface or groundwater <br />sources, includingNusshaum Spring. <br />I believe this should answer your concerns. If there are any other questions, please contact <br />me. <br />Cordially, <br />'/~~ ~,~o <br />Lloyd V. "Buck" Barhart <br />Consultant and Agent <br />Baculite Mesa, LLC <br />LVB/gb <br />Encls. <br />cc: Baculite Mesa <br />