Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />• Project: Haul Road Y-8 Project No.: 95-2384 <br />Location: Hayden, Colorado Report No.: 78 <br />Client: Seneca Coal Company <br />Work Pertomted: <br />Date: 8/7/96 <br />Time: 2.0 <br />Mileage: 30 <br />EngrJTecb: JK <br />As requested, we visited the project site on this date to conduct nuclear density tests No.'s 155 through 158 on the <br />material placed. Excavation crews placed and compacted on-site borrow fill material for the above toe drain nlis <br />on the dam being constructed for Pond 010. We also conducted a density test on material previously place for the <br />embankment. <br />Remarks: <br />The matenal tested generally met protect specifications: Compaction ranged from 97% to 99% and moisture <br />contents averaged 1 to 3% below optimum. <br />Please refer to the attached sheet for results of today's testing. <br />• Verbal Discussions: <br />Chuck McCuiloh, of Seneca Coal Company, was notified of today's test results. <br />C~ <br />