Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS. INC. <br />Project: Haul Road Y-B <br />Location: Hayden. Colorado <br />Client: Seneca Coal Company <br />Project No.: 95-2384 <br />Report No.: 75 <br /> <br />Date: 8/3/96 <br />Time: 2.0 <br />Mileage: a6 <br />Engr.lTech: JK <br />Work Pertomted: <br />As requested, we visited the protect site on this date and conducted nuclear density tests X149 through X150 on <br />the material being placed. Excavation crews places. moisted, and compacted on-site borrow material for the <br />embankment fills the Pond 010 dam adjacent to Haul Road Y-8. <br />Remarks: <br />Material tested generally met with protect specifications. Compaction of matenal tested was 99% and moisture <br />contents ranged 0.5'/o below to 0.8% above. <br />Please refer to the aaacned sheet for results of todays testing. <br />Verbal Discussions: <br />Chuck McCulloh. of Seneca Coal Company, was notfied of today's test results. <br /> <br />u <br />