Laserfiche WebLink
.~ 1 <br />Page 3 <br /> <br />3. (con't) Our operations <br />ground moisture, as there <br />and our operations consist <br />only. There is no gravel <br />unnecessary. <br /> <br />are scheduled at seasons with optimum <br />ie no water available to control dust <br />of crushing and screening road material <br />washing or other uses of water so it is <br />Again I state that all reclamation of any of our areas, which <br />constitute much more than gravel pits, are in close conjunction <br />with the Division of Wildlife, Soil Conservation, Forest Service <br />and Bureau of Land Management; and procedures follow their wishes <br />and recommendation;;. <br />I hope this will c:Larify all your questions on this matter. If <br />further information is needed, don't hesitate to call me or maybe <br />you or one of your agents could come and make on-site reviews. <br />Rasp fitfully, <br />c~cCfh'/~c~C <br />Paul Sale <br />Road Supervisor <br />San Miguel County <br />PS/jb <br />f~oad & Bridge Department <br />This is to verify ghat in regard all gravel pit ^perations through- <br />^ut San Miguel Caurity, all reclamation work shall be performed in <br />accordance with terms of Mined Land Reclamation Permit and Section <br />34-32-116 of Min~ed/ Land Reclamation Act. <br />Signed , ?~~ l". ,i~.~~1~ <br />Fred Ellerd, Chairman <br />Board of County Commissioners <br />