Laserfiche WebLink
• 2.05.3 <br />Loadout Structure -Batch Weigh System <br />The loadout structure is a structural steel building where the loadout <br />conveyor terminates. The coal is batch weighed and loaded into rail cars at <br />this location. The dimensions of the building are approximately 30 feet by 40 <br />feet by 120 feet high. <br />Railroad Track <br />Unit trains will approach the loadout from the west and switch off the <br />mainline to the south and enter the lead track. The lead track is <br />approximately 8240-feet long. There is also a parallel storage track that is <br />3,570 feet long. Approximately 2800-feet of main line track will be relocated <br />to facilitate construction of the loadout. <br />ConveyorUnderoasses <br />Three conveyor underpasses will be constructed for the downhill conveyor <br />project. One is located on the portal bench. The second is located <br />• immediately below the downhill conveyor transfer building. The third is <br />located about midway along the downhill conveyor and will serve as a wildlife <br />overpass. The underpasses are 9-foot diameter multi-plate and are <br />approximately 100-feet long. <br />(3)(b) A description of each existing structure. <br />There are no existing structures within the permit area which the applicant <br />intends to utilize for the mining operation. <br />(3)(c) A description of each road conveyor, or rail system to be constructed or used within <br />the permit area. <br />Conveyors <br />There are thirteen separate conveyors constructed on the property which are <br />described as follows: <br />1. Portal Conveyor <br />• The portal conveyor is the extension of the conveyor from within the mine. <br />PR-06 2.05 - 15 - 12/01 <br />/j PPRoVE~ <br />!~l5~0 <br />