My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102479
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:21 PM
Creation date
11/24/2007 8:52:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
MID-TERM REVIEW REVISION IMPOUNDMENTS & MONITORING PLAN
Section_Exhibit Name
TAB 7 APPENDIX 7-10
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Req. <br />SENECA II MINE <br />MtD-TERM REVIEW REVISION <br />TAB 7 <br />HYDROLOGY <br />APPENDIX 7-10 <br />IMPOUNDMENTS AND MONITORING PLAN <br />4.05.9 PERMANENT AND TEMPORARY IMPOUNDMENTS <br />Section IV.A.2 of the Tab 7 of the mining permit (C-005-BO) proposes to <br />leave the Wadge Impoundment (No. 002) as a permanent incised impoun:'- <br />ment and makes reference to leaving other sediment ponds if Peabody Coal <br />Company can justify the need to continue the use of the ponds for local <br />landowner use. It is Peabody Coal Company's desire to leave both the Wadge <br />Impoundment and the Northwest Impoundment (No. 003) as permanent <br />impoundments. This section of the Mid-Term Review Revision addresses tl~e <br />various sections of the CMLR Division's Rule 4.05.9 <br />Peabody Coal Company plans to leave the two impoundments in the <br />configuration illustrated on Exhibit 12-9 (Postmining Contours) included in <br />• this permit revision. At the Wadge Impoundment, there will be some final <br />grading along the western bank as the existing haul road is removed. Tl~e <br />flume at the outlet will be removed and the area graded and vegetated. Pt <br />the Northwest impoundment, Grassy Creek will be rechanneled to Flow <br />through the pond, the outlet culvert will be removed and the dam leveled as <br />is described in Appendix 13-3 to Permit C-005-80 in response to Stipulation <br />No. 9. The flume below The outlet culvert will also be removed and the <br />entire darn and inlet graded and vegetated. <br />4.05.9.1 The postmining land use proposed in Permit C-005-80 is livestock and <br />(a) wildlife grazing. The two impoundments will support this land use by pro- <br />viding water of sufficient quality and quantity. Tables 7-10-I, 7-10-2, nn~1 <br />7-10-3 statistically summarize the monitoring data collected between <br />January I, 1981 and September 15, 1984 at the outfall of the Wacia~° <br />Impoundment (NPDES 002) of the Northwest Impoundment (NPDES 003) acid <br />site SW-S2-2 downstream of all mining. Comparison of the data witl, the <br />water quality criteria for livestock data presented in Table 7-10-4 indicat:s <br />that mean concentrations of all parameters of interest are below tl,e <br />recommended criterion. With the single exception of a maximum lead <br />7-{0-I Revised September 28, I °~4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.