Laserfiche WebLink
• 2.05.3 <br />n <br />U <br />I• <br />TR-27 <br />AOPRovcD <br />8/a}/o3 <br />2) Haul Road along old railroad bed. <br />General Requirements <br />This road segment is approximately 2,600 feet long. Reference Map 16, <br />Haul Road Plan & Profile - Loadout Loop & Gob Pile. This road provides <br />access to the gob pile and sediment ponds C & D. Drainage from the <br />majority of this road is not contained in any sediment ponds. This road will <br />be re-constructed with the preparation plant construction project. Excess fill <br />from the preparation plant site work will be placed along this road segment. <br />Dust control on this road segment includes gravel surfacing and watering to <br />maintain surface moisture. <br />Alternative sediment control will be utilized to assure that erosion, siltation; <br />pollution of air or water, and damage to public property will be controlled. <br />The use of dust and alternative sediment control will assure that no damage <br />to fish and wildlife or other related environmental values will occur. <br />The truck traffic which will utilize this haul road segment will be 10 wheel haul <br />trucks. A 20-foot wide road surface should be adequate for these haul <br />trucks. Vehicle traffic should have no problem with this road configuration. <br />The maximum road grade on this road segment is 10%. <br />Design and Construction <br />For the construction of this road segment, all vegetation material and topsoil <br />will be removed from the design road bed, shoulders, and surfaces where <br />associated structures will be placed. Topsoil will be placed in one of the <br />topsoil stockpiles located on site. No vegetation material or topsoil will be <br />placed beneath or in any haul road embankment. <br />The embankment specification presented above applies to this road <br />segment. <br />Drainage <br />The discussion of drainage presented above under the discussion of the <br />main haul road is applicable to this road segment except drainage from this <br />road segment does not pass through a sediment pond. Drainage from this <br />2.05 - 22 - 8/03 <br />