Laserfiche WebLink
<br />J <br />Synf u¢I <br />Exp-lor~tio.n~, <br />Inc. <br />P.O. Box 2633 Grant Junction CO 81502 3[W2463017 <br />EHactira January 1, 1981 <br />FIELD INVESTIGATION AND DRltt RENTAL <br />r~ <br />~J <br />.~ <br />AUGER GRILLING <br />Standard Solid Stem S 75.00 / Hr. <br />Hollow Stem 85.00 / Hr. <br />ROTARY AND CONVENTIONAL DIAMOND CORE DRILLING <br />100' Oepth Maximum 85.00 / Hr. <br />CME-55 <br />~Wireline Diamond Core Drilling - NX <br />0 - 100' Depth 90.00 / Hr: <br />100 - 200' Oepth 95.00 / Hr. <br />200 - 400' Depth 105.00 / Hr. . <br />Bryond 400' - By Quote <br />~Wireline Diamond Core Drilling - NC <br />- 0 - 100' Oepth 95.00 / Hr. <br />100. 200' Depth 100.00 / Hr. <br />200 - 400' Depth 110.00 / Hr. <br />Beyond 400' - ey Quote <br />SKID RIG <br />Set up time 100.00 / Hr. <br />~Wireline Core Drilling - NX <br />• _ 0 • 100' Depth 110.00 / Hr. <br />100 • 200' Depth 115.00 / Hr. <br />200. 400' Depth 125.00 / Hr. <br />Beyond 400' - ey Quote <br />~Wireline Core Drilling - NC <br />0 - 100' Depth 115.00 / Hr. <br />100 - 200' Depth 120.00 / Hr. <br />200 • 400' Depth 130.00 / Hr. <br />Beyond 400' - 8y Quote <br />MOBILIZATION 100.00 minimum <br />DRILL RIG h11LEAGE lout of town( 2.00 /mile <br />SUBSISTANCE 17.00 /man Cay <br />M07EL (over 50 miles from Grand Junction) Actual Cost + 20% <br />TRAVEL TIME FOA CREW ONLY 20.00 /man hr. <br />OVERTIME, SATURDAY, SUNDAY & HOLIDAYS 24.00 / Hr. extra <br />'Maximum depth to be drilled on a job will determine rate for entire job. <br />