COLORADO
<br />N
<br />11 = 2001
<br />SAND
<br />AND
<br />GRAVEL-SANDY
<br />ACRES,
<br />2nd
<br />AMENDED APPLICATION
<br />A PART
<br />OF THE NE 1/4 OF THE $E
<br />1/4, SECTION
<br />26 AND A
<br />PART OF THE
<br />NW
<br />1/4 OF
<br />THE SW 1/4, SECTION 25, T I S.,
<br />R67W., 6th
<br />P.M., ADAMS COUNTY, COLORADO
<br />EX111B1'P P, RECLAMATION PLAN MAr
<br />Sheet 4 of 4
<br />132nd AVE.
<br />216.66' 1 216.66' 1 150.62' 1 150.62' 1 150.62' 1 150.62' 1 150.62' 1 1
<br />I L I
<br />LOT 10 "I LOT 9 "110 LOT of LOT $� LOT -°off LOT $� LOT 0001
<br />N NJ NIN 8 m 7 � 6 0, 5 �1 4 01
<br />N N Ni N N1
<br />_216.66' _ _ 216.66' 1
<br />437.32' 150.62 i 150.62 50.62' L 150.62 1
<br />r - -
<br />� fl
<br />� LOT II �1
<br />N N
<br />433.3
<br />LOT 12
<br />N N
<br />- 433.32'_
<br />_I
<br />w1 M
<br />LOT 13
<br />N NI
<br />_43332'
<br />N LOT 14 N
<br />W Cal /
<br />397.71'
<br />50.62 1 150.62 150.62 "O
<br />1 103.39
<br />of
<br />LOT °ol LOT qJ LOT
<br />/ m
<br />3 N1 2
<br />N
<br />150.62 150.62' L
<br />79.8e'J
<br />433.31'_
<br />470. _
<br />0 230'
<br />O
<br />N O
<br />r7 N
<br />N
<br />IO -
<br />q 0 LOT 4 /
<br />N ;^ ^ 14.15 Ac. ±_
<br />N N LAKE AREA_"`* /
<br />470.00' 16.85 Ac. ±
<br />383. 18' ELEV. = 5610
<br />`'
<br />t4 m LOT I aao / �N
<br />Z N 2.5 Ac. ± N
<br />_ _ 383_18_ Div \i.
<br />I LOT 2
<br />v
<br />N 2.5 Ac. ±
<br />383, if
<br />L
<br />" LOT 3
<br />m 2.5 Ac. ±
<br />N
<br />r
<br />LOT 1
<br />2.5 Ac. +
<br />1 N
<br />131_0(.,1: 3
<br />r
<br />M LOT 2
<br />N 2.5 Ac. +
<br />406.31'
<br />N
<br />Of
<br />N
<br />b
<br />LOT 3
<br />4 Ac. +
<br />A
<br />S
<br />'O
<br />h
<br />0
<br />_
<br />Reclamation 9otee:
<br />1. Operator shall plant all exposed. disturbed, atldlor reclafeed
<br />areas with grasses As detailed In apcumPsny tog report.
<br />2. Re Clamatl on ..Bali co of o r a to nil an PI icab le Adnms County
<br />Zoning Regulation at ends rds and those of the Colorado Missal!
<br />Land Reclamation Art,
<br />3. For the Pinewood I'. states p,.rtion (A Phases), all final slopes
<br />shall ba 3 to I to 10' below eater line, then 2 Co 1 to the
<br />de PC Is of the lake. The floor of the pit will be left in a
<br />reasonably ,tooth condiclans Lake aho re irregulart t lam will
<br />be constructed and If possible shallow peninsulas wl ll be
<br />created; therefore the exact lake conf lVu r it lost may vary from
<br />what is shown on this drawing. lira Inape water shall be
<br />dirac tad Into the lake area except for portions along Nome
<br />st rest that way drain to that road.
<br />for the Sandy Acre no r t l on (8 Pha ass), a elppe of 2i or
<br />steeper shall be left to the surround Ing properties and /or
<br />right -of -ways to allow surface dra/nnge. It l a t 0 r I surface
<br />drainage patterns shall be re- established. rill material
<br />Shall consist of overburden, reject /sand spoils, and clean
<br />inert It I1.
<br />4. A tar min l nP., racldeat ion, and revegetation of the Plnewvod
<br />F. s tatea property (A Phases), but prior to release of the
<br />bond, the fencing may be removed along the P newoods portion
<br />of none Street.
<br />Fe tic log of the Sandy Acres portion (B Phases) shall Certain
<br />until after all reclamation (tilling. tapsoiling, and
<br />revegetation) has been completed.
<br />5. An averape .•1 9" n! Cupsull f,r revegetation will be used on
<br />the Pinewoods 9 0 t a t es pottisn of the property (A Phases); a
<br />mini►., of h" of topsoil for revegetation will be utilized on
<br />the Sandy Acres purtton (B Pl, a s e a).
<br />P.•vegetatlan Plnu
<br />V i r t it a l I all the lands of and adjacent to the proposed permit
<br />nr ea have been historically disturbed by arricultural uses or by
<br />sand and gravel operations. The v g t atlnn accurr InIt nn these
<br />Iaods Is th 0 nor. Ind lc at ive of the native vegetation community.
<br />The f o 1 Jowl n gr it as mlxt are vaa developed free inf or a at ion
<br />auppIIeit by the So 11 Cnn Aar vat1nn Service deAcr i bInit the
<br />patent sal natural vegetat ton for th /a area. The ml store tnclude3
<br />apeties adapted to clayey and mixed an11 textures. The proposed
<br />mixture makes Provisions for $dd and bunch grasses As well As
<br />cool and warm season species. The relative mesic conditions
<br />which any be expected near share In the A Phases have also been
<br />allotted for in the mix by including species that are tolerant of
<br />hlgh water or flooding. The seeding rates are based on a density
<br />of 40 pure live seeds Per square font (drilled rate).
<br />Species 1 of Mix
<br />Western Whentgrass 30
<br />Blue Crass 20
<br />Sldeoats (;rama or PusAlan Wlldrye 20
<br />Buffalo Crass 15
<br />Created Wheatgrass 10
<br />Yellow Sweetclnver 5
<br />Total Ts
<br />40 If a seed drill proves Impractical, the broadcast method
<br />w 11 he used and the above rates will be doubled, 11
<br />broadcast seeded, the area will be covered with- a drag
<br />cha In or sI.1 l a me n sure In order to A I v e up to
<br />approximately 1/2 Loch Of soil cover.
<br />Seedlndg will occur during the early spring Ibetwoen March
<br />15 and May 15 if possible) to order to take advantage of
<br />.ofI so lstiare cundll lolls.
<br />0 Bosca on Indlca[ tons from u somber of soil fertility tests
<br />cued acted on soils located nn the Pinewood I. st.1 tes
<br />pr o Per tis , feet l l Izer ,III he applied at a rate of SO
<br />Fba. /ae. available nitrogen, and 50 /bs. /ac. available
<br />phosphorus.
<br />11 ay wu lc I. wt 11 be a p p I led at a r+, to or appr o xi mn to I 1.5
<br />tons /acre, and mechanically crisped to anchor it agaiPat
<br />blowing.
<br />A series of drought resistant trees shall be planted at
<br />approximate 50 foot intervals in the 10' st r I al Ong
<br />L'.S.B5.
<br />Reclamntinn Tfm("L,
<br />For the A Phases, except for Ih la area of p s, I b I r tnpso I
<br />storage, rehabll l tat ton and revegetat Ion should be accompl/shell
<br />ao the Pinewood I.stslea (A Phases) Portion of the property by the
<br />end of 19AR.
<br />For thr B Phase, and that area of Possible to pnoII storage nn the
<br />A Phases, the mining and backfilling with reject material Is
<br />expected to take Irom 3 to 5 yearn, or until 1990 to 1992. The
<br />remalnl nit filling with Inert material could take an additional S
<br />Years, or until 1997, Market conditions are variable and till,
<br />schedule could increase or decrease.
<br />V
<br />SEP 2 8 1987
<br />!(1/n 0-� G .
<br />IN / /
<br />REVISIONS ENGINEERING
<br />DATE IDESCRIPTiON INITIALS
<br />7-ZA -07 6EA/EPAL Ar /S /ONS GAJ 86-70
<br />QUEST CONSULTING INC.
<br />DENVER, COLORADO GD2 :I SCANNED
<br />is (303) 426 -843G
<br />DRAWN art G_ q J
<br />APPROVED- IIIIIIIIINIIIIIIIIINIIIIIIIIIIINIIIIIIIIIIIIIII
<br />APPROVEDt R N F
<br />00014451
<br />5 - 26 - 87 G. A. J
<br />
|